IAC Assessment: AM0144
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0144
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1992
Principal Product HARDWOOD LUMBER
NAICS n/a
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 0
Annual Production 5,800 Thousand Feet
Production Hrs. Annual 4,426
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,610 1,010,258 kWh $0.07
TOTAL ENERGY COSTS $72,610
RECOMMENDED SAVINGS* $44,343 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Administrative Changes Electricity Usage Administrative Changes
$ kWh $ $
01: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$30,000
Cost:
-
- - $30,000 - -
-
kWh
$30,000
-
$
02: 2.5123 REDUCE FLUID FLOW RATES Savings:
$7,610
Cost:
$750
$7,610 114,889 - - $7,610
114,889
kWh
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,370
Cost:
$6,000
$3,370 - - - $3,370
-
kWh
-
-
$
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$1,990
Cost:
-
$1,990 38,101 - - $1,990
38,101
kWh
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$423
Cost:
$960
$480 7,034 $(-57) - $480
7,034
kWh
$(-57)
-
$
06: 2.6232 INSTALL SET-BACK TIMERS Savings:
$350
Cost:
-
$350 6,741 - - $350
6,741
kWh
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$340
Cost:
$300
$340 6,448 - - $340
6,448
kWh
-
-
$
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$260
Cost:
$510
$260 3,810 - - $260
3,810
kWh
-
-
$
TOTAL RECOMMENDED Savings:
$44,343
Cost:
$8,520
$14,400 177,023 $29,943 - $14,400
177,023
kWh
$29,943
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
$
Savings
Cost
$ kWh $ $
Electricity Usage Administrative Changes Electricity Usage Administrative Changes