IAC logo
IAC Assessment: AM0148
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0148
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1992
Principal Product OFFICE CHAIRS
NAICS n/a
SIC 2522 - Office Furniture, Except Wood
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 0
Annual Production 750,000 Pieces
Production Hrs. Annual 2,445
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,362 1,177,022 kWh $0.06
Natural Gas $22,646 4,324 MMBtu $5.24
TOTAL ENERGY COSTS $89,008
RECOMMENDED SAVINGS* $4,195 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,055
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7226 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE Savings:
$1,800
Cost:
$400
- - $1,800 357 - - -
-
kWh
$1,800
357
MMBtu
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,275
Cost:
$1,275
$1,275 50,996 - - - - $1,275
50,996
kWh
-
-
MMBtu
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$496
Cost:
$420
$496 19,930 - - - - $496
19,930
kWh
-
-
MMBtu
-
-
$
04: 2.6232 INSTALL SET-BACK TIMERS Savings:
$354
Cost:
$350
$354 10,258 - - - - $354
10,258
kWh
-
-
MMBtu
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$130
Cost:
-
$154 879 - - $(-24) - $154
879
kWh
-
-
MMBtu
$(-24)
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$140
Cost:
$200
$140 5,569 - - - - $140
5,569
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$4,195
Cost:
$2,645
$2,419 87,632 $1,800 357 $(-24) - $2,419
87,632
kWh
$1,800
357
MMBtu
$(-24)
-
$
TOTAL IMPLEMENTED Savings:
$4,055
Cost:
$2,445
$2,279 82,063 $1,800 357 $(-24) - $2,279
82,063
kWh
$1,800
357
MMBtu
$(-24)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes