IAC Assessment: AM0158
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0158
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1992
Principal Product METAL CLEANING
NAICS n/a
SIC 3479 - Metal Coating And Allied Services
Sales $10,000,000-$50,000,000
# of Employees 430
Plant Area (Sq.Ft.) 0
Annual Production 9,600,000 Pounds
Production Hrs. Annual 6,040
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $510,692 9,296,600 kWh $0.05
Natural Gas $275,328 97,593 MMBtu $2.82
TOTAL ENERGY COSTS $786,020
RECOMMENDED SAVINGS* $93,635 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $29,205
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,797
Cost:
$7,379
$14,475 260,258 - - $(-678) - $14,475
260,258
kWh
-
-
MMBtu
$(-678)
-
$
02: 2.6232 INSTALL SET-BACK TIMERS Savings:
$29,200
Cost:
$19,590
$29,200 498,242 - - - - $29,200
498,242
kWh
-
-
MMBtu
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$17,300
Cost:
$21,640
- - $17,300 6,150 - - -
-
kWh
$17,300
6,150
MMBtu
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$11,800
Cost:
$32,000
$11,800 - - - - - $11,800
-
kWh
-
-
MMBtu
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,200
Cost:
$960
$6,200 241,501 - - - - $6,200
241,501
kWh
-
-
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,370
Cost:
$4,050
- - $4,370 1,550 - - -
-
kWh
$4,370
1,550
MMBtu
-
-
$
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$3,780
Cost:
$870
- - $3,780 1,342 - - -
-
kWh
$3,780
1,342
MMBtu
-
-
$
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,190
Cost:
$1,150
- - $3,700 1,310 $(-1,510) - -
-
kWh
$3,700
1,310
MMBtu
$(-1,510)
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,760
Cost:
$5,950
- - $1,760 624 - - -
-
kWh
$1,760
624
MMBtu
-
-
$
10: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$1,600
Cost:
$170
- - $1,600 570 - - -
-
kWh
$1,600
570
MMBtu
-
-
$
11: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$1,213
Cost:
-
$1,213 - - - - - $1,213
-
kWh
-
-
MMBtu
-
-
$
12: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$425
Cost:
-
$425 16,413 - - - - $425
16,413
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$93,635
Cost:
$93,759
$63,313 1,016,414 $32,510 11,546 $(-2,188) - $63,313
1,016,414
kWh
$32,510
11,546
MMBtu
$(-2,188)
-
$
TOTAL IMPLEMENTED Savings:
$29,205
Cost:
$10,529
$22,313 518,172 $9,080 3,222 $(-2,188) - $22,313
518,172
kWh
$9,080
3,222
MMBtu
$(-2,188)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes