IAC Assessment: AM0171
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0171
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1993
Principal Product steel plate tank heads
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 145
Plant Area (Sq.Ft.) 881,664
Annual Production 24,000 Pieces
Production Hrs. Annual 7,248
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $491,985 7,868,406 kWh $0.06
Natural Gas $261,727 113,011 MMBtu $2.32
TOTAL ENERGY COSTS $753,712
RECOMMENDED SAVINGS* $72,280 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,460
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$11,850
Cost:
$820
- - $11,850 5,120 -
-
kWh
$11,850
5,120
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$10,780
Cost:
$10,160
- - $10,780 4,660 -
-
kWh
$10,780
4,660
MMBtu
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$22,300
Cost:
$54,800
$22,300 827,081 - - $22,300
827,081
kWh
-
-
MMBtu
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$18,500
Cost:
$72,675
$18,500 684,642 - - $18,500
684,642
kWh
-
-
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,710
Cost:
$10,160
- - $2,710 1,170 -
-
kWh
$2,710
1,170
MMBtu
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,100
Cost:
-
$3,100 114,302 - - $3,100
114,302
kWh
-
-
MMBtu
07: 2.5194 REDESIGN PROCESS Savings:
$830
Cost:
$712
- - $830 357 -
-
kWh
$830
357
MMBtu
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,690
Cost:
$4,630
$1,690 62,720 - - $1,690
62,720
kWh
-
-
MMBtu
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$520
Cost:
-
$520 19,343 - - $520
19,343
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$72,280
Cost:
$153,957
$46,110 1,708,088 $26,170 11,307 $46,110
1,708,088
kWh
$26,170
11,307
MMBtu
TOTAL IMPLEMENTED Savings:
$39,460
Cost:
$60,250
$27,610 1,023,446 $11,850 5,120 $27,610
1,023,446
kWh
$11,850
5,120
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas