IAC logo
IAC Assessment: AM0204
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0204
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1994
Principal Product Heating, Air conditioning, ventilating equipment
NAICS n/a
SIC 3433 - Heating Equipment, Except Electric
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 151,000
Annual Production 27,000 Pieces
Production Hrs. Annual 4,320
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $212,625 3,838,511 kWh $0.06
Natural Gas $37,009 7,357 MMBtu $5.03
TOTAL ENERGY COSTS $249,634
RECOMMENDED SAVINGS* $8,797 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,702
#|Description Savings
Cost
Status Electricity Usage Solid Waste (haz) Electricity Usage Solid Waste (haz)
$ kWh $ lb
01: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$3,520
Cost:
$1,000
$3,520 52,755 - - $3,520
52,755
kWh
-
-
lb
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,520
Cost:
$1,500
$2,520 108,441 - - $2,520
108,441
kWh
-
-
lb
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$660
Cost:
$13
$660 12,896 - - $660
12,896
kWh
-
-
lb
04: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$100
Cost:
$185
$100 4,396 - - $100
4,396
kWh
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$102
Cost:
$52
$102 1,172 - - $102
1,172
kWh
-
-
lb
06: 3.5111 FILTER AND REUSE HYDRAULIC OIL Savings:
$1,800
Cost:
-
- - $1,800 4,290 -
-
kWh
$1,800
4,290
lb
07: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$95
Cost:
$6,000
- - $95 160 -
-
kWh
$95
160
lb
TOTAL RECOMMENDED Savings:
$8,797
Cost:
$8,750
$6,902 179,660 $1,895 4,450 $6,902
179,660
kWh
$1,895
4,450
lb
TOTAL IMPLEMENTED Savings:
$8,702
Cost:
$2,750
$6,902 179,660 $1,800 4,290 $6,902
179,660
kWh
$1,800
4,290
lb
Savings
Cost
$ kWh $ lb
Electricity Usage Solid Waste (haz) Electricity Usage Solid Waste (haz)