IAC logo
IAC Assessment: AM0210
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0210
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1994
Principal Product Newspapers
NAICS n/a
SIC 2711 - Newspapers
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 43,500
Annual Production 9,360,000 Pieces
Production Hrs. Annual 5,824
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $85,271 1,388,335 kWh $0.06
Natural Gas $6,824 1,458 MMBtu $4.68
TOTAL ENERGY COSTS $92,095
RECOMMENDED SAVINGS* $5,367 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,527
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$1,430
Cost:
$680
$1,050 26,377 $380 82 $1,050
26,377
kWh
$380
82
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,107
Cost:
$910
$1,107 21,395 - - $1,107
21,395
kWh
-
-
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$890
Cost:
$150
- - $890 190 -
-
kWh
$890
190
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$880
Cost:
$500
$880 21,981 - - $880
21,981
kWh
-
-
MMBtu
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$840
Cost:
-
$840 21,102 - - $840
21,102
kWh
-
-
MMBtu
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$220
Cost:
-
$220 5,569 - - $220
5,569
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$5,367
Cost:
$2,240
$4,097 96,424 $1,270 272 $4,097
96,424
kWh
$1,270
272
MMBtu
TOTAL IMPLEMENTED Savings:
$4,527
Cost:
$2,240
$3,257 75,322 $1,270 272 $3,257
75,322
kWh
$1,270
272
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas