IAC logo
IAC Assessment: AM0229
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0229
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1995
Principal Product Zip-close reusable plastic film storage bags
NAICS n/a
SIC 2673 - Bags: Plastics, Laminated, & Coated
Sales $10,000,000-$50,000,000
# of Employees 166
Plant Area (Sq.Ft.) 112,500
Annual Production 1,380,000,000 Pieces
Production Hrs. Annual 7,224
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $401,685 7,334,115 kWh $0.05
Natural Gas $2,487 484 MMBtu $5.14
TOTAL ENERGY COSTS $406,592
RECOMMENDED SAVINGS* $96,690 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $88,130
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Administrative Changes Electricity Usage Solid Waste (non-haz) Administrative Changes
$ kWh $ lb $ $
01: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$53,900
Cost:
-
- - - - $53,900 - -
-
kWh
-
-
lb
$53,900
-
$
02: 2.8211 CONSOLIDATE FREIGHT SHIPMENTS AND/OR DELIVERIES Savings:
$32,000
Cost:
$42,000
- - $32,000 200,000 - - -
-
kWh
$32,000
200,000
lb
-
-
$
03: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$6,760
Cost:
-
- - - - $6,760 - -
-
kWh
-
-
lb
$6,760
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,800
Cost:
-
$1,800 36,049 - - - - $1,800
36,049
kWh
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,760
Cost:
$570
$1,760 34,584 - - - - $1,760
34,584
kWh
-
-
lb
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$470
Cost:
$200
$470 9,379 - - - - $470
9,379
kWh
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$96,690
Cost:
$42,770
$4,030 80,012 $32,000 200,000 $60,660 - $4,030
80,012
kWh
$32,000
200,000
lb
$60,660
-
$
TOTAL IMPLEMENTED Savings:
$88,130
Cost:
$42,770
$2,230 43,963 $32,000 200,000 $53,900 - $2,230
43,963
kWh
$32,000
200,000
lb
$53,900
-
$
Savings
Cost
$ kWh $ lb $ $
Electricity Usage Solid Waste (non-haz) Administrative Changes Electricity Usage Solid Waste (non-haz) Administrative Changes