IAC logo
IAC Assessment: AM0238
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0238
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1995
Principal Product Carbon and alloy steel, seamless and welded, pipe and tubing
NAICS n/a
SIC 3317 - Steel Pipe And Tubes
Sales $10,000,000-$50,000,000
# of Employees 265
Plant Area (Sq.Ft.) 155,000
Annual Production 37,103 Tons
Production Hrs. Annual 3,993
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,448,333 32,234,174 kWh $0.04
Natural Gas $496,774 220,953 MMBtu $2.25
TOTAL ENERGY COSTS $1,945,107
RECOMMENDED SAVINGS* $206,690 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,130
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (haz) Administrative Changes Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (haz) Administrative Changes
$ kWh $ MMBtu $ gal $ lb $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$178,800
Cost:
-
- - - - - - - - $178,800 - -
-
kWh
-
-
MMBtu
-
-
gal
-
-
lb
$178,800
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,140
Cost:
$6,200
- - $7,140 3,180 - - - - - - -
-
kWh
$7,140
3,180
MMBtu
-
-
gal
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$420
Cost:
$180
$420 7,620 - - - - - - - - $420
7,620
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$360
Cost:
$230
$360 8,206 - - - - - - - - $360
8,206
kWh
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
05: 3.7134 WASH AND REUSE RAGS ON-SITE Savings:
$10,620
Cost:
$15,800
- - - - - - $10,620 124,400 - - -
-
kWh
-
-
MMBtu
-
-
gal
$10,620
124,400
lb
-
-
$
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$9,350
Cost:
-
- - - - $9,350 - - - - - -
-
kWh
-
-
MMBtu
$9,350
-
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$206,690
Cost:
$22,410
$780 15,826 $7,140 3,180 $9,350 - $10,620 124,400 $178,800 - $780
15,826
kWh
$7,140
3,180
MMBtu
$9,350
-
gal
$10,620
124,400
lb
$178,800
-
$
TOTAL IMPLEMENTED Savings:
$10,130
Cost:
$410
$780 15,826 - - $9,350 - - - - - $780
15,826
kWh
-
-
MMBtu
$9,350
-
gal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ MMBtu $ gal $ lb $ $
Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (haz) Administrative Changes Electricity Usage Natural Gas Other Liquid (haz) Solid Waste (haz) Administrative Changes