Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 1995 |
Principal Product | Carbon and alloy steel, seamless and welded, pipe and tubing |
NAICS | n/a |
SIC | 3317 - Steel Pipe And Tubes |
Sales | $10,000,000-$50,000,000 |
# of Employees | 265 |
Plant Area (Sq.Ft.) | 155,000 |
Annual Production | 37,103 Tons |
Production Hrs. Annual | 3,993 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,448,333 | 32,234,174 | kWh | $0.04 |
Natural Gas | $496,774 | 220,953 | MMBtu | $2.25 |
TOTAL ENERGY COSTS | $1,945,107 | |||
RECOMMENDED SAVINGS* | $206,690 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,130 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (haz) | Administrative Changes | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $178,800 Cost: - |
- | - | - | - | - | - | - | - | $178,800 | - |
- - kWh |
- - MMBtu |
- - gal |
- - lb |
$178,800 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $7,140 Cost: $6,200 |
- | - | $7,140 | 3,180 | - | - | - | - | - | - |
- - kWh |
$7,140 3,180 MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $420 Cost: $180 |
$420 | 7,620 | - | - | - | - | - | - | - | - |
$420 7,620 kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $360 Cost: $230 |
$360 | 8,206 | - | - | - | - | - | - | - | - |
$360 8,206 kWh |
- - MMBtu |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.7134 WASH AND REUSE RAGS ON-SITE |
Savings: $10,620 Cost: $15,800 |
- | - | - | - | - | - | $10,620 | 124,400 | - | - |
- - kWh |
- - MMBtu |
- - gal |
$10,620 124,400 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL |
Savings: $9,350 Cost: - |
- | - | - | - | $9,350 | - | - | - | - | - |
- - kWh |
- - MMBtu |
$9,350 - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $206,690 Cost: $22,410 |
$780 | 15,826 | $7,140 | 3,180 | $9,350 | - | $10,620 | 124,400 | $178,800 | - | $780 15,826 kWh |
$7,140 3,180 MMBtu |
$9,350 - gal |
$10,620 124,400 lb |
$178,800 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,130 Cost: $410 |
$780 | 15,826 | - | - | $9,350 | - | - | - | - | - | $780 15,826 kWh |
- - MMBtu |
$9,350 - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (haz) | Administrative Changes | Electricity Usage | Natural Gas | Other Liquid (haz) | Solid Waste (haz) | Administrative Changes |