Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1996
Principal Product O-rings, lip seals, V-packing
NAICS n/a
SIC 3053 - Gaskets, Packing And Sealing Devices
Sales $5,000,000-$10,000,000
# of Employees 85
Plant Area (Sq.Ft.) 32,500
Annual Production 1,500,000 Pieces
Production Hrs. Annual 4,675
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $96,917 1,806,272 kWh $0.05
Electricity Demand $17,551 5,282 kW-months/year $3.32
Electricity Fees $1,035 - $ -
TOTAL ENERGY COSTS $125,503
RECOMMENDED SAVINGS* $8,002 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,830
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material
$ kWh $ kW-months/year $ $ $ lb $ $ $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,635
Cost:
$620
$1,035 41,325 $1,600 161 - - - - - - - - - - $1,035
41,325
kWh
$1,600
161
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$1,317
Cost:
-
- - $(-17,317) - $(-5,650) - - - - - $24,284 - - - -
-
kWh
$(-17,317)
-
kW-months/year
$(-5,650)
-
$
-
-
lb
-
-
$
$24,284
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$870
Cost:
$330
$30 2,345 $60 2 - - - - $780 - - - - - $30
2,345
kWh
$60
2
kW-months/year
-
-
$
-
-
lb
$780
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$790
Cost:
$400
$790 24,033 - - - - - - - - - - - - $790
24,033
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$470
Cost:
-
$470 18,757 - - - - - - - - - - - - $470
18,757
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
-
-
$
06: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$1,220
Cost:
$110
- - - - - - $310 1,940 - - - - $910 - -
-
kWh
-
-
kW-months/year
-
-
$
$310
1,940
lb
-
-
$
-
-
$
$910
-
$
07: 3.5213 REUSE SCRAP PRINTED PAPER FOR MAKE-READY Savings:
$700
Cost:
$1,110
- - - - - - $2,000 20,000 - - $(-1,300) - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,000
20,000
lb
-
-
$
$(-1,300)
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$8,002
Cost:
$2,570
$2,325 86,460 $(-15,657) 163 $(-5,650) - $2,310 21,940 $780 - $22,984 - $910 - $2,325
86,460
kWh
$(-15,657)
163
kW-months/year
$(-5,650)
-
$
$2,310
21,940
lb
$780
-
$
$22,984
-
$
$910
-
$
TOTAL IMPLEMENTED Savings:
$2,830
Cost:
$1,840
$1,290 45,135 $60 2 - - $2,000 20,000 $780 - $(-1,300) - - - $1,290
45,135
kWh
$60
2
kW-months/year
-
-
$
$2,000
20,000
lb
$780
-
$
$(-1,300)
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Administrative Changes Primary Raw Material