IAC Assessment: AM0266
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0266
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1996
Principal Product Bridge & slide bearings
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 50,000
Annual Production 72,000 Pieces
Production Hrs. Annual 5,481
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $66,327 1,662,954 kWh $0.04
Electricity Demand $41,323 4,938 kW-months/year $8.37
Natural Gas $41,509 11,062 MMBtu $3.75
TOTAL ENERGY COSTS $153,359
RECOMMENDED SAVINGS* $5,745 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,745
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,370
Cost:
$400
$2,370 91,149 - - - - - - $2,370
91,149
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$390
Cost:
-
$390 15,533 - - - - - - $390
15,533
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$375
Cost:
$185
$110 4,103 $265 21 - - - - $110
4,103
kWh
$265
21
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$360
Cost:
$710
- - - - $360 97 - - -
-
kWh
-
-
kW-months/year
$360
97
MMBtu
-
-
lb
05: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$2,250
Cost:
$6,600
- - - - - - $2,250 6,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,250
6,000
lb
TOTAL RECOMMENDED Savings:
$5,745
Cost:
$7,895
$2,870 110,785 $265 21 $360 97 $2,250 6,000 $2,870
110,785
kWh
$265
21
kW-months/year
$360
97
MMBtu
$2,250
6,000
lb
TOTAL IMPLEMENTED Savings:
$5,745
Cost:
$7,895
$2,870 110,785 $265 21 $360 97 $2,250 6,000 $2,870
110,785
kWh
$265
21
kW-months/year
$360
97
MMBtu
$2,250
6,000
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)