IAC Assessment: AM0270
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0270
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1996
Principal Product Insulated electric heating/freezing protection for pipes, va
NAICS n/a
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $50,000,000-$100,000,000
# of Employees 290
Plant Area (Sq.Ft.) 94,000
Annual Production 6,000 Thousand Feet
Production Hrs. Annual 2,500
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $95,676 2,597,011 kWh $0.04
Electricity Demand $75,626 8,593 kW-months/year $8.80
Electricity Fees $1,003 - $ -
Natural Gas $3,215 826 MMBtu $3.89
TOTAL ENERGY COSTS $176,820
RECOMMENDED SAVINGS* $15,708 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,068
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ lb $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$7,585
Cost:
$10,350
$7,585 216,882 - - - - - - - - $7,585
216,882
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
02: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$1,930
Cost:
-
- - - - $1,930 - - - - - -
-
kWh
-
-
kW-months/year
$1,930
-
$
-
-
lb
-
-
$
03: 2.7145 INSTALL SKYLIGHTS Savings:
$1,435
Cost:
$2,870
$1,435 41,032 - - - - - - - - $1,435
41,032
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
04: 2.8112 COMBINE UTILITY METERS Savings:
$1,390
Cost:
$500
- - - - $1,390 - - - - - -
-
kWh
-
-
kW-months/year
$1,390
-
$
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$720
Cost:
$1,570
$130 3,810 $50 5 - - - - $540 - $130
3,810
kWh
$50
5
kW-months/year
-
-
$
-
-
lb
$540
-
$
06: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$508
Cost:
-
- - - - $508 - - - - - -
-
kWh
-
-
kW-months/year
$508
-
$
-
-
lb
-
-
$
07: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$370
Cost:
$120
$160 4,982 $210 24 - - - - - - $160
4,982
kWh
$210
24
kW-months/year
-
-
$
-
-
lb
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$370
Cost:
$300
$370 10,551 - - - - - - - - $370
10,551
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$100
Cost:
-
$100 3,517 - - - - - - - - $100
3,517
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
10: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$860
Cost:
-
- - - - - - $860 60,560 - - -
-
kWh
-
-
kW-months/year
-
-
$
$860
60,560
lb
-
-
$
11: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$440
Cost:
-
- - - - - - $440 5,200 - - -
-
kWh
-
-
kW-months/year
-
-
$
$440
5,200
lb
-
-
$
TOTAL RECOMMENDED Savings:
$15,708
Cost:
$15,710
$9,780 280,774 $260 29 $3,828 - $1,300 65,760 $540 - $9,780
280,774
kWh
$260
29
kW-months/year
$3,828
-
$
$1,300
65,760
lb
$540
-
$
TOTAL IMPLEMENTED Savings:
$4,068
Cost:
$1,870
$600 17,878 $50 5 $2,438 - $440 5,200 $540 - $600
17,878
kWh
$50
5
kW-months/year
$2,438
-
$
$440
5,200
lb
$540
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes