Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1996
Principal Product Vinyl binders and business accessories
NAICS n/a
SIC 2782 - Blankbooks And Looseleaf Binders
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 281,000
Annual Production 12,000,000 Pieces
Production Hrs. Annual 5,704
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $139,381 3,399,179 kWh $0.04
Electricity Demand $93,168 11,269 kW-months/year $8.27
Electricity Fees $536 - $ -
Natural Gas $4,628 831 MMBtu $5.57
TOTAL ENERGY COSTS $237,713
RECOMMENDED SAVINGS* $63,180 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $63,180
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$11,610
Cost:
$55,390
$3,130 120,457 $8,480 670 - - $3,130
120,457
kWh
$8,480
670
kW-months/year
-
-
lb
02: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$6,050
Cost:
$29,160
$1,700 65,651 $4,350 343 - - $1,700
65,651
kWh
$4,350
343
kW-months/year
-
-
lb
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,900
Cost:
$140
$570 21,981 $1,330 105 - - $570
21,981
kWh
$1,330
105
kW-months/year
-
-
lb
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,150
Cost:
$800
$1,150 44,549 - - - - $1,150
44,549
kWh
-
-
kW-months/year
-
-
lb
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,600
Cost:
$300
$1,600 61,547 - - - - $1,600
61,547
kWh
-
-
kW-months/year
-
-
lb
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$920
Cost:
$410
$260 9,965 $660 52 - - $260
9,965
kWh
$660
52
kW-months/year
-
-
lb
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$680
Cost:
-
$680 26,084 - - - - $680
26,084
kWh
-
-
kW-months/year
-
-
lb
08: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$27,000
Cost:
-
- - - - $27,000 959,000 -
-
kWh
-
-
kW-months/year
$27,000
959,000
lb
09: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$12,270
Cost:
$2,500
- - - - $12,270 14,400 -
-
kWh
-
-
kW-months/year
$12,270
14,400
lb
TOTAL RECOMMENDED Savings:
$63,180
Cost:
$88,700
$9,090 350,234 $14,820 1,170 $39,270 973,400 $9,090
350,234
kWh
$14,820
1,170
kW-months/year
$39,270
973,400
lb
TOTAL IMPLEMENTED Savings:
$63,180
Cost:
$88,700
$9,090 350,234 $14,820 1,170 $39,270 973,400 $9,090
350,234
kWh
$14,820
1,170
kW-months/year
$39,270
973,400
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)