Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 1996 |
Principal Product | Frozen desserts |
NAICS | n/a |
SIC | 2024 - Ice Cream And Frozen Desserts |
Sales | $50,000,000-$100,000,000 |
# of Employees | 140 |
Plant Area (Sq.Ft.) | 158,000 |
Annual Production | 12,500 Thousand Gallons |
Production Hrs. Annual | 7,488 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $582,310 | 16,487,984 | kWh | $0.04 |
Electricity Demand | $237,130 | 36,363 | kW-months/year | $6.52 |
Natural Gas | $45,273 | 9,194 | MMBtu | $4.92 |
TOTAL ENERGY COSTS | $864,713 | |||
RECOMMENDED SAVINGS* | $58,440 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $57,300 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $43,960 Cost: $40,000 |
- | - | $43,960 | 3,571 | - | - | - | - | - | - | - | - |
- - kWh |
$43,960 3,571 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,860 Cost: $500 |
- | - | - | - | $1,860 | 377 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,860 377 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $1,940 Cost: $4,320 |
$370 | 16,706 | $310 | 25 | $1,260 | 255 | - | - | - | - | - | - |
$370 16,706 kWh |
$310 25 kW-months/year |
$1,260 255 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS |
Savings: $1,570 Cost: $100 |
- | - | - | - | $1,570 | 320 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,570 320 MMBtu |
- - Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,140 Cost: $1,180 |
$200 | 9,086 | $150 | 12 | - | - | - | - | - | - | $790 | - |
$200 9,086 kWh |
$150 12 kW-months/year |
- - MMBtu |
- - Tgal |
- - lb |
$790 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES |
Savings: $5,900 Cost: $100 |
- | - | - | - | - | - | $5,900 | 2,927,300 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$5,900 2,927,300 Tgal |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $2,070 Cost: - |
- | - | - | - | - | - | - | - | $2,070 | 41,300 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$2,070 41,300 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $58,440 Cost: $46,200 |
$570 | 25,792 | $44,420 | 3,608 | $4,690 | 952 | $5,900 | 2,927,300 | $2,070 | 41,300 | $790 | - | $570 25,792 kWh |
$44,420 3,608 kW-months/year |
$4,690 952 MMBtu |
$5,900 2,927,300 Tgal |
$2,070 41,300 lb |
$790 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $57,300 Cost: $45,020 |
$370 | 16,706 | $44,270 | 3,596 | $4,690 | 952 | $5,900 | 2,927,300 | $2,070 | 41,300 | - | - | $370 16,706 kWh |
$44,270 3,596 kW-months/year |
$4,690 952 MMBtu |
$5,900 2,927,300 Tgal |
$2,070 41,300 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Solid Waste (non-haz) | Personnel Changes |