IAC logo
IAC Assessment: AM0287
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0287
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1997
Principal Product Oilfield service equipment
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 128,800
Annual Production 7,200 Pieces
Production Hrs. Annual 8,208
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $273,343 5,084,994 kWh $0.05
Electricity Demand $71,937 11,158 kW-months/year $6.45
Electricity Fees $29,023 - $ -
TOTAL ENERGY COSTS $2,958,802
RECOMMENDED SAVINGS* $22,230 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,890
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ gal $ lb $ $
01: 2.3134 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION Savings:
$13,800
Cost:
-
- - $13,800 1,120 - - - - - - - - -
-
kWh
$13,800
1,120
kW-months/year
-
-
$
-
-
gal
-
-
lb
-
-
$
02: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$4,280
Cost:
-
- - - - $4,280 - - - - - - - -
-
kWh
-
-
kW-months/year
$4,280
-
$
-
-
gal
-
-
lb
-
-
$
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,490
Cost:
-
$490 22,274 $1,000 81 - - - - - - - - $490
22,274
kWh
$1,000
81
kW-months/year
-
-
$
-
-
gal
-
-
lb
-
-
$
04: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$1,300
Cost:
-
- - - - - - - - - - $1,300 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
gal
-
-
lb
$1,300
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$680
Cost:
$300
$680 31,067 - - - - - - - - - - $680
31,067
kWh
-
-
kW-months/year
-
-
$
-
-
gal
-
-
lb
-
-
$
06: 3.6194 SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM Savings:
$240
Cost:
-
- - - - - - $240 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$240
-
gal
-
-
lb
-
-
$
07: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$440
Cost:
-
- - - - - - - - $440 7,000 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
gal
$440
7,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$22,230
Cost:
$300
$1,170 53,341 $14,800 1,201 $4,280 - $240 - $440 7,000 $1,300 - $1,170
53,341
kWh
$14,800
1,201
kW-months/year
$4,280
-
$
$240
-
gal
$440
7,000
lb
$1,300
-
$
TOTAL IMPLEMENTED Savings:
$6,890
Cost:
$300
$1,170 53,341 $1,000 81 $4,280 - - - $440 7,000 - - $1,170
53,341
kWh
$1,000
81
kW-months/year
$4,280
-
$
-
-
gal
$440
7,000
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ gal $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost