IAC Assessment: AM0299
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0299
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1997
Principal Product Printed wiring assemblies for airborne radar equipment, moda
NAICS n/a
SIC 3812 - Search And Navigation Equipment
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 154,320
Annual Production 12,050 Pieces
Production Hrs. Annual 3,751
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $206,620 7,104,338 kWh $0.03
Electricity Demand $133,947 14,472 kW-months/year $9.26
Electricity Fees $5,122 - $ -
TOTAL ENERGY COSTS $354,613
RECOMMENDED SAVINGS* $76,020 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $72,930
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ lb $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$33,000
Cost:
$80,500
$13,750 398,593 $4,000 440 - - - - $15,250 - - - $13,750
398,593
kWh
$4,000
440
kW-months/year
-
-
gal
-
-
lb
$15,250
-
$
-
-
$
02: 3.3125 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS Savings:
$17,850
Cost:
$16,760
- - - - $17,850 923 - - - - - - -
-
kWh
-
-
kW-months/year
$17,850
923
gal
-
-
lb
-
-
$
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$16,500
Cost:
$29,520
$16,500 477,726 - - - - - - - - - - $16,500
477,726
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$2,700
Cost:
$8,000
- - - - - - - - - - $2,700 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
$2,700
-
$
05: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$2,070
Cost:
$560
$2,070 59,789 - - - - - - - - - - $2,070
59,789
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$1,860
Cost:
-
- - - - - - $1,860 81,600 - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
$1,860
81,600
lb
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,230
Cost:
$1,140
$250 7,327 $90 70 - - - - $890 - - - $250
7,327
kWh
$90
70
kW-months/year
-
-
gal
-
-
lb
$890
-
$
-
-
$
08: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$520
Cost:
-
$300 8,792 $220 24 - - - - - - - - $300
8,792
kWh
$220
24
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$290
Cost:
$200
$290 8,499 - - - - - - - - - - $290
8,499
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$76,020
Cost:
$136,680
$33,160 960,726 $4,310 534 $17,850 923 $1,860 81,600 $16,140 - $2,700 - $33,160
960,726
kWh
$4,310
534
kW-months/year
$17,850
923
gal
$1,860
81,600
lb
$16,140
-
$
$2,700
-
$
TOTAL IMPLEMENTED Savings:
$72,930
Cost:
$135,540
$32,910 953,399 $4,220 464 $17,850 923 - - $15,250 - $2,700 - $32,910
953,399
kWh
$4,220
464
kW-months/year
$17,850
923
gal
-
-
lb
$15,250
-
$
$2,700
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost