IAC logo
IAC Assessment: AM0301
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0301
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1997
Principal Product Processed beef and chicken, and other meat and poultry
NAICS n/a
SIC 2011 - Meat Packing Plants
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 15,000
Annual Production 25,000,000 Pounds
Production Hrs. Annual 4,080
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $96,608 2,124,267 kWh $0.05
Electricity Demand $14,803 5,375 kW-months/year $2.75
Electricity Fees $3,692 - $ -
Natural Gas $3,730 693 MMBtu $5.38
TOTAL ENERGY COSTS $118,833
RECOMMENDED SAVINGS* $121,019 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $121,019
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ lb $ $
01: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$114,000
Cost:
$3,000
- - - - - - $114,000 51,000 - - -
-
kWh
-
-
kW-months/year
-
-
$
$114,000
51,000
lb
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$2,930
Cost:
$3,040
- - $2,930 238 - - - - - - -
-
kWh
$2,930
238
kW-months/year
-
-
$
-
-
lb
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,600
Cost:
$1,750
- - $1,600 130 - - - - - - -
-
kWh
$1,600
130
kW-months/year
-
-
$
-
-
lb
-
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,000
Cost:
$1,085
- - $1,000 81 - - - - - - -
-
kWh
$1,000
81
kW-months/year
-
-
$
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$595
Cost:
$480
$70 2,638 $45 4 - - - - $480 - $70
2,638
kWh
$45
4
kW-months/year
-
-
$
-
-
lb
$480
-
$
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$505
Cost:
-
$505 18,757 - - - - - - - - $505
18,757
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$242
Cost:
$800
- - - - $242 - - - - - -
-
kWh
-
-
kW-months/year
$242
-
$
-
-
lb
-
-
$
08: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$147
Cost:
-
$50 1,758 $97 8 - - - - - - $50
1,758
kWh
$97
8
kW-months/year
-
-
$
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$121,019
Cost:
$10,155
$625 23,153 $5,672 461 $242 - $114,000 51,000 $480 - $625
23,153
kWh
$5,672
461
kW-months/year
$242
-
$
$114,000
51,000
lb
$480
-
$
TOTAL IMPLEMENTED Savings:
$121,019
Cost:
$10,155
$625 23,153 $5,672 461 $242 - $114,000 51,000 $480 - $625
23,153
kWh
$5,672
461
kW-months/year
$242
-
$
$114,000
51,000
lb
$480
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes