IAC logo
IAC Assessment: AM0330
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0330
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1998
Principal Product Aluminum extruded products
NAICS n/a
SIC 3354 - Aluminum Extruded Products
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 81,400
Annual Production 10,000,000 Pounds
Production Hrs. Annual 6,880
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $166,967 2,341,735 kWh $0.07
Electricity Demand $7,985 24,040 kW-months/year $0.33
Natural Gas $99,145 16,484 MMBtu $6.01
TOTAL ENERGY COSTS $286,552
RECOMMENDED SAVINGS* $41,331 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,057
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ lb
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$19,460
Cost:
$17,210
- - $19,460 1,908 - - - - - - - - -
-
kWh
$19,460
1,908
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
02: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS Savings:
$4,820
Cost:
-
- - - - $4,820 - - - - - - - -
-
kWh
-
-
kW-months/year
$4,820
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
03: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$4,560
Cost:
$100
- - - - - - - - - - $4,560 6,160 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$4,560
6,160
lb
04: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$2,740
Cost:
-
- - - - - - - - - - $2,740 106,700 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$2,740
106,700
lb
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,450
Cost:
$350
- - - - - - $2,450 407 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,450
407
MMBtu
-
-
Tgal
-
-
lb
06: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$1,938
Cost:
-
- - - - $1,938 - - - - - - - -
-
kWh
-
-
kW-months/year
$1,938
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
07: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS Savings:
$1,440
Cost:
-
- - $1,440 106 - - - - - - - - -
-
kWh
$1,440
106
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
08: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$1,260
Cost:
$40
- - - - - - - - $1,260 201,500 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,260
201,500
Tgal
-
-
lb
09: 4.2310 PURCHASE EQUIPMENT INSTEAD OF LEASING Savings:
$814
Cost:
$1,120
$(-470) (-13,775) - - $1,284 - - - - - - - $(-470)
(-13,775)
kWh
-
-
kW-months/year
$1,284
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
10: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$420
Cost:
-
$420 6,448 - - - - - - - - - - $420
6,448
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
11: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$405
Cost:
-
$405 11,137 - - - - - - - - - - $405
11,137
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
12: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$340
Cost:
$20
$190 5,275 $150 15 - - - - - - - - $190
5,275
kWh
$150
15
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
13: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$275
Cost:
-
$150 4,396 $125 12 - - - - - - - - $150
4,396
kWh
$125
12
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
14: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$239
Cost:
$745
$159 4,396 $80 8 - - - - - - - - $159
4,396
kWh
$80
8
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
15: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$170
Cost:
-
$170 4,689 - - - - - - - - - - $170
4,689
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$41,331
Cost:
$19,585
$1,024 22,566 $21,255 2,049 $8,042 - $2,450 407 $1,260 201,500 $7,300 112,860 $1,024
22,566
kWh
$21,255
2,049
kW-months/year
$8,042
-
$
$2,450
407
MMBtu
$1,260
201,500
Tgal
$7,300
112,860
lb
TOTAL IMPLEMENTED Savings:
$21,057
Cost:
$1,255
$1,494 36,341 $1,795 141 $6,758 - $2,450 407 $1,260 201,500 $7,300 112,860 $1,494
36,341
kWh
$1,795
141
kW-months/year
$6,758
-
$
$2,450
407
MMBtu
$1,260
201,500
Tgal
$7,300
112,860
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ lb
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Solid Waste (non-haz)