IAC logo
IAC Assessment: AM0341
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0341
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1999
Principal Product Gypsum wallboard
NAICS n/a
SIC 3275 - Gypsum Products
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 275,000
Annual Production 250,000 Thousand Feet
Production Hrs. Annual 0
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,399,546 50,674,678 kWh $0.03
Electricity Demand $419,225 100,667 kW-months/year $4.16
Natural Gas $2,371,040 956,694 MMBtu $2.48
TOTAL ENERGY COSTS $4,189,811
RECOMMENDED SAVINGS* $43,905 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,135
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$15,300
Cost:
$500
- - - - $15,300 6,190 -
-
kWh
-
-
kW-months/year
$15,300
6,190
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$11,600
Cost:
$500
- - - - $11,600 4,700 -
-
kWh
-
-
kW-months/year
$11,600
4,700
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,760
Cost:
$18,630
$2,600 119,871 $2,160 188 - - $2,600
119,871
kWh
$2,160
188
kW-months/year
-
-
MMBtu
04: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$6,140
Cost:
$780
- - - - $6,140 2,485 -
-
kWh
-
-
kW-months/year
$6,140
2,485
MMBtu
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$3,380
Cost:
-
$1,820 83,822 $1,560 136 - - $1,820
83,822
kWh
$1,560
136
kW-months/year
-
-
MMBtu
06: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$720
Cost:
-
$720 33,118 - - - - $720
33,118
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$650
Cost:
-
$650 30,188 - - - - $650
30,188
kWh
-
-
kW-months/year
-
-
MMBtu
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$540
Cost:
$905
- - - - $540 221 -
-
kWh
-
-
kW-months/year
$540
221
MMBtu
09: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$415
Cost:
-
$220 9,965 $195 17 - - $220
9,965
kWh
$195
17
kW-months/year
-
-
MMBtu
10: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$250
Cost:
-
$250 11,723 - - - - $250
11,723
kWh
-
-
kW-months/year
-
-
MMBtu
11: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$150
Cost:
-
$150 7,034 - - - - $150
7,034
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$43,905
Cost:
$21,315
$6,410 295,721 $3,915 341 $33,580 13,596 $6,410
295,721
kWh
$3,915
341
kW-months/year
$33,580
13,596
MMBtu
TOTAL IMPLEMENTED Savings:
$42,135
Cost:
$21,315
$4,640 213,658 $3,915 341 $33,580 13,596 $4,640
213,658
kWh
$3,915
341
kW-months/year
$33,580
13,596
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas