IAC logo
IAC Assessment: AM0348
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0348
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1999
Principal Product Blow out preventors, drilling riser components
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $10,000,000-$50,000,000
# of Employees 93
Plant Area (Sq.Ft.) 60,000
Annual Production 2,720 Pieces
Production Hrs. Annual 5,470
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $132,735 2,270,516 kWh $0.06
Electricity Demand $22,246 7,296 kW-months/year $3.05
Electricity Fees $9,454 - $ -
Natural Gas $43,552 6,830 MMBtu $6.38
TOTAL ENERGY COSTS $207,987
RECOMMENDED SAVINGS* $67,366 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,910
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$23,000
Cost:
$19,400
- - $23,000 1,897 - - - - - - -
-
kWh
$23,000
1,897
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$14,050
Cost:
$14,046
- - - - $14,050 - - - - - -
-
kWh
-
-
kW-months/year
$14,050
-
$
-
-
MMBtu
-
-
$
03: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$11,691
Cost:
$2,000
- - $(-26,886) - $38,577 - - - - - -
-
kWh
$(-26,886)
-
kW-months/year
$38,577
-
$
-
-
MMBtu
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$11,110
Cost:
$10,500
- - - - - - $11,110 1,742 - - -
-
kWh
-
-
kW-months/year
-
-
$
$11,110
1,742
MMBtu
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,860
Cost:
-
$6,860 196,073 - - - - - - - - $6,860
196,073
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$655
Cost:
$405
$60 1,758 $40 3 - - - - $555 - $60
1,758
kWh
$40
3
kW-months/year
-
-
$
-
-
MMBtu
$555
-
$
TOTAL RECOMMENDED Savings:
$67,366
Cost:
$46,351
$6,920 197,831 $(-3,846) 1,900 $52,627 - $11,110 1,742 $555 - $6,920
197,831
kWh
$(-3,846)
1,900
kW-months/year
$52,627
-
$
$11,110
1,742
MMBtu
$555
-
$
TOTAL IMPLEMENTED Savings:
$20,910
Cost:
$14,046
$6,860 196,073 - - $14,050 - - - - - $6,860
196,073
kWh
-
-
kW-months/year
$14,050
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes