IAC logo
IAC Assessment: AM0355
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0355
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1999
Principal Product Subsurface oilwell pumps, pumping equipment
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 500,000
Annual Production 72,000 Pieces
Production Hrs. Annual 2,008
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $280,606 6,830,598 kWh $0.04
Electricity Demand $182,600 33,857 kW-months/year $5.39
Natural Gas $42,058 14,573 MMBtu $2.89
TOTAL ENERGY COSTS $505,264
RECOMMENDED SAVINGS* $37,685 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,405
#|Description Savings
Cost
Status Electricity Usage Solid Waste (non-haz) Personnel Changes Electricity Usage Solid Waste (non-haz) Personnel Changes
$ kWh $ lb $ $
01: 4.4540 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$25,130
Cost:
-
- - - - $25,130 - -
-
kWh
-
-
lb
$25,130
-
$
02: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$5,910
Cost:
$150
- - $5,910 146,900 - - -
-
kWh
$5,910
146,900
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,285
Cost:
$1,400
$365 9,672 - - $1,920 - $365
9,672
kWh
-
-
lb
$1,920
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,300
Cost:
$500
$2,300 60,375 - - - - $2,300
60,375
kWh
-
-
lb
-
-
$
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$570
Cost:
$150
$570 14,947 - - - - $570
14,947
kWh
-
-
lb
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$540
Cost:
$600
$540 14,361 - - - - $540
14,361
kWh
-
-
lb
-
-
$
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$470
Cost:
-
$470 12,309 - - - - $470
12,309
kWh
-
-
lb
-
-
$
08: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$360
Cost:
$1,480
$360 9,672 - - - - $360
9,672
kWh
-
-
lb
-
-
$
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$120
Cost:
-
$120 3,224 - - - - $120
3,224
kWh
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$37,685
Cost:
$4,280
$4,725 124,560 $5,910 146,900 $27,050 - $4,725
124,560
kWh
$5,910
146,900
lb
$27,050
-
$
TOTAL IMPLEMENTED Savings:
$30,405
Cost:
$2,050
$3,355 88,218 - - $27,050 - $3,355
88,218
kWh
-
-
lb
$27,050
-
$
Savings
Cost
$ kWh $ lb $ $
Electricity Usage Solid Waste (non-haz) Personnel Changes Electricity Usage Solid Waste (non-haz) Personnel Changes