Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 1999 |
Principal Product | Subsurface oilwell pumps, pumping equipment |
NAICS | n/a |
SIC | 3533 - Oil And Gas Field Machinery |
Sales | $50,000,000-$100,000,000 |
# of Employees | 250 |
Plant Area (Sq.Ft.) | 500,000 |
Annual Production | 72,000 Pieces |
Production Hrs. Annual | 2,008 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $280,606 | 6,830,598 | kWh | $0.04 |
Electricity Demand | $182,600 | 33,857 | kW-months/year | $5.39 |
Natural Gas | $42,058 | 14,573 | MMBtu | $2.89 |
TOTAL ENERGY COSTS | $505,264 | |||
RECOMMENDED SAVINGS* | $37,685 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $30,405 |
#|Description |
Savings Cost |
Status | Electricity Usage | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.454 MODIFY STARTUP/SHUTDOWN TIMES |
Savings: $25,130 Cost: - |
- | - | - | - | $25,130 | - |
- - kWh |
- - lb |
$25,130 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT |
Savings: $5,910 Cost: $150 |
- | - | $5,910 | 146,900 | - | - |
- - kWh |
$5,910 146,900 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,285 Cost: $1,400 |
$365 | 9,672 | - | - | $1,920 | - |
$365 9,672 kWh |
- - lb |
$1,920 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,300 Cost: $500 |
$2,300 | 60,375 | - | - | - | - |
$2,300 60,375 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $570 Cost: $150 |
$570 | 14,947 | - | - | - | - |
$570 14,947 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $540 Cost: $600 |
$540 | 14,361 | - | - | - | - |
$540 14,361 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $470 Cost: - |
$470 | 12,309 | - | - | - | - |
$470 12,309 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $360 Cost: $1,480 |
$360 | 9,672 | - | - | - | - |
$360 9,672 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $120 Cost: - |
$120 | 3,224 | - | - | - | - |
$120 3,224 kWh |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $37,685 Cost: $4,280 |
$4,725 | 124,560 | $5,910 | 146,900 | $27,050 | - | $4,725 124,560 kWh |
$5,910 146,900 lb |
$27,050 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $30,405 Cost: $2,050 |
$3,355 | 88,218 | - | - | $27,050 | - | $3,355 88,218 kWh |
- - lb |
$27,050 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Solid Waste (non-haz) | Personnel Changes |