IAC logo
IAC Assessment: AM0357
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0357
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 1999
Principal Product Brass tubular plumbing supplies, Plastic tubular plumbing su
NAICS n/a
SIC 3432 - Plumbing Fixture Fittings And Trim
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 140,000
Annual Production 3,000,000 Pieces
Production Hrs. Annual 6,528
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $153,414 4,172,919 kWh $0.04
Electricity Demand $91,958 11,348 kW-months/year $8.10
Natural Gas $39,982 12,453 MMBtu $3.21
TOTAL ENERGY COSTS $285,354
RECOMMENDED SAVINGS* $302,910 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $255,620
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Electricity Usage Electricity Demand Water Disposal Personnel Changes
$ kWh $ kW-months/year $ Tgal $ $
01: 4.621 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES Savings:
$250,000
Cost:
$285,000
- - - - - - $250,000 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$250,000
-
$
02: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$45,000
Cost:
$1,200
- - - - $45,000 11,031,000 - - -
-
kWh
-
-
kW-months/year
$45,000
11,031,000
Tgal
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,500
Cost:
$30
$1,880 72,392 $1,620 133 - - - - $1,880
72,392
kWh
$1,620
133
kW-months/year
-
-
Tgal
-
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,830
Cost:
$600
$1,830 70,633 - - - - - - $1,830
70,633
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
05: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,000
Cost:
-
- - - - - - $1,000 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$1,000
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$640
Cost:
$500
$90 3,517 $50 5 - - $500 - $90
3,517
kWh
$50
5
kW-months/year
-
-
Tgal
$500
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$460
Cost:
$400
$460 17,585 - - - - - - $460
17,585
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$330
Cost:
$150
$330 12,603 - - - - - - $330
12,603
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$150
Cost:
$150
$150 5,569 - - - - - - $150
5,569
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$302,910
Cost:
$288,030
$4,740 182,299 $1,670 138 $45,000 11,031,000 $251,500 - $4,740
182,299
kWh
$1,670
138
kW-months/year
$45,000
11,031,000
Tgal
$251,500
-
$
TOTAL IMPLEMENTED Savings:
$255,620
Cost:
$285,830
$2,450 94,081 $1,670 138 - - $251,500 - $2,450
94,081
kWh
$1,670
138
kW-months/year
-
-
Tgal
$251,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Personnel Changes Electricity Usage Electricity Demand Water Disposal Personnel Changes