IAC Assessment: AM0372
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0372
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2000
Principal Product high density polyethylene barrels and containers
NAICS n/a
SIC 3432 - Plumbing Fixture Fittings And Trim
Sales $10,000,000-$50,000,000
# of Employees 60
Plant Area (Sq.Ft.) 90,000
Annual Production 6,000,000 Pieces
Production Hrs. Annual 8,520
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $304,608 8,492,087 kWh $0.04
Electricity Demand $143,505 20,458 kW-months/year $7.01
Natural Gas $1,419 295 MMBtu $4.81
TOTAL ENERGY COSTS $449,532
RECOMMENDED SAVINGS* $25,502 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,262
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,100
Cost:
-
$3,650 126,026 $2,450 340 - - - - $3,650
126,026
kWh
$2,450
340
kW-months/year
-
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,700
Cost:
$500
$5,700 196,366 - - - - - - $5,700
196,366
kWh
-
-
kW-months/year
-
-
lb
-
-
$
03: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$3,850
Cost:
-
- - - - - - $3,850 - -
-
kWh
-
-
kW-months/year
-
-
lb
$3,850
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,065
Cost:
$210
$2,260 77,960 $805 110 - - - - $2,260
77,960
kWh
$805
110
kW-months/year
-
-
lb
-
-
$
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$2,592
Cost:
$150
- - - - $2,592 71,907 - - -
-
kWh
-
-
kW-months/year
$2,592
71,907
lb
-
-
$
06: 2.7145 INSTALL SKYLIGHTS Savings:
$1,300
Cost:
$5,520
$1,300 45,135 - - - - - - $1,300
45,135
kWh
-
-
kW-months/year
-
-
lb
-
-
$
07: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$940
Cost:
$734
$690 24,033 $250 33 - - - - $690
24,033
kWh
$250
33
kW-months/year
-
-
lb
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$585
Cost:
-
$435 14,947 $150 21 - - - - $435
14,947
kWh
$150
21
kW-months/year
-
-
lb
-
-
$
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$585
Cost:
-
$585 20,223 - - - - - - $585
20,223
kWh
-
-
kW-months/year
-
-
lb
-
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$470
Cost:
$210
$470 16,413 - - - - - - $470
16,413
kWh
-
-
kW-months/year
-
-
lb
-
-
$
11: 3.7212 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) Savings:
$315
Cost:
-
- - - - $315 880 - - -
-
kWh
-
-
kW-months/year
$315
880
lb
-
-
$
TOTAL RECOMMENDED Savings:
$25,502
Cost:
$7,324
$15,090 521,103 $3,655 504 $2,907 72,787 $3,850 - $15,090
521,103
kWh
$3,655
504
kW-months/year
$2,907
72,787
lb
$3,850
-
$
TOTAL IMPLEMENTED Savings:
$23,262
Cost:
$1,070
$13,100 451,935 $3,405 471 $2,907 72,787 $3,850 - $13,100
451,935
kWh
$3,405
471
kW-months/year
$2,907
72,787
lb
$3,850
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost