IAC Assessment: AM0376
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2000
Principal Product Oil field drilling bits
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 184,000
Annual Production 30,000 Pieces
Production Hrs. Annual 8,688
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $620,615 21,119,871 kWh $0.03
Electricity Demand $234,214 37,303 kW-months/year $6.28
Natural Gas $99,165 30,402 MMBtu $3.26
TOTAL ENERGY COSTS $953,994
RECOMMENDED SAVINGS* $106,762 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,390
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$77,809
Cost:
$157,500
$57,903 2,144,490 $19,906 2,934 - - $57,903
2,144,490
kWh
$19,906
2,934
kW-months/year
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$19,313
Cost:
$32,300
$14,395 568,288 $4,918 734 - - $14,395
568,288
kWh
$4,918
734
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,410
Cost:
$3,340
$360 13,189 $120 18 $4,930 - $360
13,189
kWh
$120
18
kW-months/year
$4,930
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,250
Cost:
-
$1,250 46,307 - - - - $1,250
46,307
kWh
-
-
kW-months/year
-
-
$
05: 2.7131 ADD AREA LIGHTING SWITCHES Savings:
$950
Cost:
$640
$950 35,463 - - - - $950
35,463
kWh
-
-
kW-months/year
-
-
$
06: 2.7134 USE PHOTOCELL CONTROLS Savings:
$730
Cost:
$605
$730 26,964 - - - - $730
26,964
kWh
-
-
kW-months/year
-
-
$
07: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$700
Cost:
$350
$700 25,791 - - - - $700
25,791
kWh
-
-
kW-months/year
-
-
$
08: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$600
Cost:
$1,030
$600 21,981 - - - - $600
21,981
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$106,762
Cost:
$195,765
$76,888 2,882,473 $24,944 3,686 $4,930 - $76,888
2,882,473
kWh
$24,944
3,686
kW-months/year
$4,930
-
$
TOTAL IMPLEMENTED Savings:
$8,390
Cost:
$5,965
$3,340 123,388 $120 18 $4,930 - $3,340
123,388
kWh
$120
18
kW-months/year
$4,930
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes