IAC logo
IAC Assessment: AM0377
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0377
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2000
Principal Product Oil drilling equipment
NAICS n/a
SIC 3533 - Oil And Gas Field Machinery
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 120,000
Annual Production 45,020 Pieces
Production Hrs. Annual 3,218
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $108,923 2,286,635 kWh $0.05
Electricity Demand $22,039 5,651 kW-months/year $3.90
Natural Gas $7,845 2,227 MMBtu $3.52
TOTAL ENERGY COSTS $138,807
RECOMMENDED SAVINGS* $45,460 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,560
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Other Liquid (haz) Ancillary Material Cost Primary Product
$ kWh $ kW-months/year $ gal $ $ $ $
01: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$27,190
Cost:
-
- - - - $13,440 2,418 $13,750 - - - -
-
kWh
-
-
kW-months/year
$13,440
2,418
gal
$13,750
-
$
-
-
$
02: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$11,500
Cost:
$6,100
- - - - - - - - $11,500 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
$11,500
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,870
Cost:
$500
$4,870 92,028 - - - - - - - - $4,870
92,028
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
04: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$900
Cost:
$1,000
- - - - - - - - $900 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
$
$900
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$450
Cost:
$110
$450 8,499 - - - - - - - - $450
8,499
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
06: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$320
Cost:
-
$290 5,569 $30 8 - - - - - - $290
5,569
kWh
$30
8
kW-months/year
-
-
gal
-
-
$
-
-
$
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$230
Cost:
-
$230 4,396 - - - - - - - - $230
4,396
kWh
-
-
kW-months/year
-
-
gal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$45,460
Cost:
$7,710
$5,840 110,492 $30 8 $13,440 2,418 $13,750 - $12,400 - $5,840
110,492
kWh
$30
8
kW-months/year
$13,440
2,418
gal
$13,750
-
$
$12,400
-
$
TOTAL IMPLEMENTED Savings:
$44,560
Cost:
$6,710
$5,840 110,492 $30 8 $13,440 2,418 $13,750 - $11,500 - $5,840
110,492
kWh
$30
8
kW-months/year
$13,440
2,418
gal
$13,750
-
$
$11,500
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $ $ $
Electricity Usage Electricity Demand Other Liquid (haz) Ancillary Material Cost Primary Product Electricity Usage Electricity Demand Other Liquid (haz) Ancillary Material Cost Primary Product