IAC logo
IAC Assessment: AM0380
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0380
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2000
Principal Product machine shop products, parts for aircraft
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $1,000,000-$5,000,000
# of Employees 35
Plant Area (Sq.Ft.) 150,000
Annual Production 86,000 Pieces
Production Hrs. Annual 2,932
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $62,704 1,587,339 kWh $0.04
Electricity Demand $46,062 6,024 kW-months/year $7.65
Electricity Fees $672 - $ -
Natural Gas $6,914 1,274 MMBtu $5.43
TOTAL ENERGY COSTS $116,352
RECOMMENDED SAVINGS* $18,746 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,554
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $ $ $
01: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$9,200
Cost:
$1,000
- - - - - - $9,200 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$9,200
-
$
-
-
$
-
-
$
-
-
$
02: 2.8112 COMBINE UTILITY METERS Savings:
$3,644
Cost:
$8,000
- - $3,140 957 $504 - - - - - - - - - -
-
kWh
$3,140
957
kW-months/year
$504
-
$
-
-
$
-
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,800
Cost:
$50
$1,800 39,859 - - - - - - - - - - - - $1,800
39,859
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
04: 2.8118 CHECK FOR ACCURACY OF UTILITY / POWER METERS Savings:
$1,798
Cost:
-
- - - - - - - - - - - - $1,798 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
$1,798
-
$
05: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$527
Cost:
$800
- - - - - - - - $527 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$527
-
$
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$520
Cost:
$25
$300 6,741 $220 27 - - - - - - - - - - $300
6,741
kWh
$220
27
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$600
Cost:
$1,000
$280 6,155 $320 26 - - - - - - - - - - $280
6,155
kWh
$320
26
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
08: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$392
Cost:
-
- - - - - - - - - - $392 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
$392
-
$
-
-
$
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$265
Cost:
-
$150 3,224 $115 14 - - - - - - - - - - $150
3,224
kWh
$115
14
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$18,746
Cost:
$10,875
$2,530 55,979 $3,795 1,024 $504 - $9,200 - $527 - $392 - $1,798 - $2,530
55,979
kWh
$3,795
1,024
kW-months/year
$504
-
$
$9,200
-
$
$527
-
$
$392
-
$
$1,798
-
$
TOTAL IMPLEMENTED Savings:
$8,554
Cost:
$8,875
$2,250 49,824 $3,475 998 $504 - - - $527 - - - $1,798 - $2,250
49,824
kWh
$3,475
998
kW-months/year
$504
-
$
-
-
$
$527
-
$
-
-
$
$1,798
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Personnel Changes Administrative Changes Ancillary Material Cost One-time Revenue or Avoided Cost