IAC logo
IAC Assessment: AM0381
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0381
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2000
Principal Product Extruded plastic netting for produce bags, shelf lining, sha
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 121
Plant Area (Sq.Ft.) 110,600
Annual Production 4,200,000 Pounds
Production Hrs. Annual 8,592
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $149,702 4,675,557 kWh $0.03
Electricity Demand $120,070 8,988 kW-months/year $13.36
Natural Gas $9,107 1,692 MMBtu $5.38
TOTAL ENERGY COSTS $327,066
RECOMMENDED SAVINGS* $87,635 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $44,518
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $
01: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$42,600
Cost:
$18,000
- - - - - - $42,600 23,000 - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$42,600
23,000
lb
-
-
$
-
-
$
02: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$28,100
Cost:
$2,300
$900 26,964 - - $27,200 4,100,000 - - - - - - $900
26,964
kWh
-
-
kW-months/year
$27,200
4,100,000
Tgal
-
-
lb
-
-
$
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$16,000
Cost:
$100
$16,000 477,140 - - - - - - - - - - $16,000
477,140
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$517
Cost:
$1,034
- - - - - - - - - - $517 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
$517
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$275
Cost:
-
- - - - - - - - - - $275 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
lb
-
-
$
$275
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$143
Cost:
$290
$41 1,172 $25 2 - - - - $77 - - - $41
1,172
kWh
$25
2
kW-months/year
-
-
Tgal
-
-
lb
$77
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$87,635
Cost:
$21,724
$16,941 505,276 $25 2 $27,200 4,100,000 $42,600 23,000 $77 - $792 - $16,941
505,276
kWh
$25
2
kW-months/year
$27,200
4,100,000
Tgal
$42,600
23,000
lb
$77
-
$
$792
-
$
TOTAL IMPLEMENTED Savings:
$44,518
Cost:
$2,690
$16,941 505,276 $25 2 $27,200 4,100,000 - - $77 - $275 - $16,941
505,276
kWh
$25
2
kW-months/year
$27,200
4,100,000
Tgal
-
-
lb
$77
-
$
$275
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ lb $ $ $ $
Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Water Disposal Solid Waste (non-haz) Personnel Changes Administrative Changes