IAC logo
IAC Assessment: AM0386
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0386
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2001
Principal Product Metal drums, plastic drum inserts
NAICS n/a
SIC 3412 - Metal Barrels, Drums, And Pails
Sales $10,000,000-$50,000,000
# of Employees 76
Plant Area (Sq.Ft.) 180,000
Annual Production 2,590,000 Pieces
Production Hrs. Annual 3,344
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $189,423 3,814,771 kWh $0.05
Electricity Demand $67,884 13,449 kW-months/year $5.05
Electricity Fees $3,649 - $ -
Natural Gas $87,535 23,828 MMBtu $3.67
TOTAL ENERGY COSTS $348,491
RECOMMENDED SAVINGS* $23,631 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ $ $ lb $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,670
Cost:
$18,600
- - $12,670 1,572 - - - - - - -
-
kWh
$12,670
1,572
kW-months/year
-
-
$
-
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,650
Cost:
$500
$5,650 122,802 - - - - - - - - $5,650
122,802
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
03: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$1,615
Cost:
$5,500
- - - - - - $1,615 41,470 - - -
-
kWh
-
-
kW-months/year
-
-
$
$1,615
41,470
lb
-
-
$
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$1,420
Cost:
-
- - - - $1,420 - - - - - -
-
kWh
-
-
kW-months/year
$1,420
-
$
-
-
lb
-
-
$
05: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$1,258
Cost:
-
- - - - $1,258 - - - - - -
-
kWh
-
-
kW-months/year
$1,258
-
$
-
-
lb
-
-
$
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$520
Cost:
-
$520 11,137 - - - - - - - - $520
11,137
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$220
Cost:
$215
$90 20,809 $20 3 - - - - $110 - $90
20,809
kWh
$20
3
kW-months/year
-
-
$
-
-
lb
$110
-
$
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$178
Cost:
-
$113 2,638 $65 10 - - - - - - $113
2,638
kWh
$65
10
kW-months/year
-
-
$
-
-
lb
-
-
$
09: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$100
Cost:
-
$100 2,052 - - - - - - - - $100
2,052
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$23,631
Cost:
$24,815
$6,473 159,438 $12,755 1,585 $2,678 - $1,615 41,470 $110 - $6,473
159,438
kWh
$12,755
1,585
kW-months/year
$2,678
-
$
$1,615
41,470
lb
$110
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes