IAC Assessment: AM0400
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0400
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2001
Principal Product White portland cement
NAICS n/a
SIC 3241 - Cement, Hydraulic
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 0
Annual Production 115,000 Tons
Production Hrs. Annual 8,736
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $537,579 22,988,793 kWh $0.02
Electricity Demand $165,459 40,740 kW-months/year $4.06
Electricity Fees $5,213 - $ -
Natural Gas $1,262,872 477,204 MMBtu $2.65
Other Energy $868,001 910,000 MMBtu $0.95
TOTAL ENERGY COSTS $2,839,124
RECOMMENDED SAVINGS* $128,930 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,810
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$124,120
Cost:
-
$6,120 221,000 - - - - $118,000 59,000,000 $6,120
221,000
kWh
-
-
kW-months/year
-
-
MMBtu
$118,000
59,000,000
Tgal
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,720
Cost:
-
$490 17,300 - - $1,230 349 - - $490
17,300
kWh
-
-
kW-months/year
$1,230
349
MMBtu
-
-
Tgal
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,150
Cost:
$2,750
$990 35,350 $160 32 - - - - $990
35,350
kWh
$160
32
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,040
Cost:
$960
$680 24,240 $360 72 - - - - $680
24,240
kWh
$360
72
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$900
Cost:
$200
$900 31,700 - - - - - - $900
31,700
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$128,930
Cost:
$3,910
$9,180 329,590 $520 104 $1,230 349 $118,000 59,000,000 $9,180
329,590
kWh
$520
104
kW-months/year
$1,230
349
MMBtu
$118,000
59,000,000
Tgal
TOTAL IMPLEMENTED Savings:
$4,810
Cost:
$3,910
$3,060 108,590 $520 104 $1,230 349 - - $3,060
108,590
kWh
$520
104
kW-months/year
$1,230
349
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal