Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 2001 |
Principal Product | Lithographic printing |
NAICS | n/a |
SIC | 2752 - Commercial Printing, Lithographic |
Sales | $100,000,000-$500,000,000 |
# of Employees | 275 |
Plant Area (Sq.Ft.) | 166,000 |
Annual Production | 100,000 Tons |
Production Hrs. Annual | 8,448 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $466,836 | 8,999,233 | kWh | $0.05 |
Electricity Demand | $110,279 | 18,276 | kW-months/year | $6.03 |
Electricity Fees | $5,880 | - | $ | - |
Natural Gas | $319,738 | 45,900 | MMBtu | $6.97 |
TOTAL ENERGY COSTS | $902,733 | |||
RECOMMENDED SAVINGS* | $239,820 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $224,380 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.322 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL |
Savings: $198,000 Cost: $25,000 |
- | - | - | - | - | - | $198,000 | - |
- - kWh |
- - kW-months/year |
- - lb |
$198,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.7132 REUSE RAGS UNTIL COMPLETELY SOILED |
Savings: $12,600 Cost: - |
- | - | - | - | $12,600 | 6,600 | - | - |
- - kWh |
- - kW-months/year |
$12,600 6,600 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $15,440 Cost: - |
- | - | - | - | $15,440 | 200,000 | - | - |
- - kWh |
- - kW-months/year |
$15,440 200,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,330 Cost: $41,800 |
$3,220 | 65,000 | $1,190 | 100 | - | - | $1,920 | - |
$3,220 65,000 kWh |
$1,190 100 kW-months/year |
- - lb |
$1,920 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,800 Cost: $2,828 |
$2,500 | 50,500 | $1,300 | 109 | - | - | - | - |
$2,500 50,500 kWh |
$1,300 109 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,710 Cost: $368 |
$2,710 | 54,700 | - | - | - | - | - | - |
$2,710 54,700 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $250 Cost: - |
$250 | 5,000 | - | - | - | - | - | - |
$250 5,000 kWh |
- - kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $690 Cost: $765 |
$320 | 6,520 | $110 | 9 | - | - | $260 | - |
$320 6,520 kWh |
$110 9 kW-months/year |
- - lb |
$260 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $239,820 Cost: $70,761 |
$9,000 | 181,720 | $2,600 | 218 | $28,040 | 206,600 | $200,180 | - | $9,000 181,720 kWh |
$2,600 218 kW-months/year |
$28,040 206,600 lb |
$200,180 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $224,380 Cost: $70,761 |
$9,000 | 181,720 | $2,600 | 218 | $12,600 | 6,600 | $200,180 | - | $9,000 181,720 kWh |
$2,600 218 kW-months/year |
$12,600 6,600 lb |
$200,180 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes |