IAC Assessment: AM0406
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0406
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2002
Principal Product Polyethylene containers
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 84,000
Annual Production 12,500,000 Pieces
Production Hrs. Annual 6,024
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $139,410 3,474,400 kWh $0.04
Electricity Demand $63,414 7,780 kW-months/year $8.15
Electricity Fees $3,322 - $ -
Natural Gas $26,140 4,120 MMBtu $6.34
TOTAL ENERGY COSTS $232,286
RECOMMENDED SAVINGS* $9,465 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,465
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,400
Cost:
$1,600
- - - - $3,400 540 - - - - -
-
kWh
-
-
kW-months/year
$3,400
540
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,975
Cost:
$2,250
$1,230 29,900 $745 60 - - - - - - $1,230
29,900
kWh
$745
60
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,460
Cost:
$200
$1,460 36,100 - - - - - - - - $1,460
36,100
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 3.7131 USE A RAG RECYCLE SERVICE Savings:
$830
Cost:
-
- - - - - - - - $830 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$830
-
$
05: 3.7132 REUSE RAGS UNTIL COMPLETELY SOILED Savings:
$830
Cost:
-
- - - - - - - - $830 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$830
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$520
Cost:
$320
$80 1,960 $35 3 - - $405 - - - $80
1,960
kWh
$35
3
kW-months/year
-
-
MMBtu
$405
-
$
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$450
Cost:
$1,035
$450 10,930 - - - - - - - - $450
10,930
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$9,465
Cost:
$5,405
$3,220 78,890 $780 63 $3,400 540 $405 - $1,660 - $3,220
78,890
kWh
$780
63
kW-months/year
$3,400
540
MMBtu
$405
-
$
$1,660
-
$
TOTAL IMPLEMENTED Savings:
$9,465
Cost:
$5,405
$3,220 78,890 $780 63 $3,400 540 $405 - $1,660 - $3,220
78,890
kWh
$780
63
kW-months/year
$3,400
540
MMBtu
$405
-
$
$1,660
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost