IAC Assessment: AM0409
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0409
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2002
Principal Product Abrasive blasting and recovery equipment
NAICS n/a
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 56
Plant Area (Sq.Ft.) 85,000
Annual Production 4,200 Pieces
Production Hrs. Annual 2,068
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,809 1,025,856 kWh $0.07
Electricity Demand $19,725 6,483 kW-months/year $3.04
TOTAL ENERGY COSTS $93,534
RECOMMENDED SAVINGS* $25,853 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $23,493
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$10,660
Cost:
$15,375
- - $10,660 1,945 - - - - - - -
-
kWh
$10,660
1,945
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$5,870
Cost:
$12,210
$5,870 83,700 - - - - - - - - $5,870
83,700
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,120
Cost:
$6,440
$1,630 23,320 $490 90 - - - - - - $1,630
23,320
kWh
$490
90
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 3.7132 REUSE RAGS UNTIL COMPLETELY SOILED Savings:
$1,850
Cost:
-
- - - - $1,850 1,000 - - - - -
-
kWh
-
-
kW-months/year
$1,850
1,000
lb
-
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,600
Cost:
$800
$1,600 22,800 - - - - - - - - $1,600
22,800
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,140
Cost:
-
$1,140 16,300 - - - - - - - - $1,140
16,300
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$840
Cost:
$170
$840 12,000 - - - - - - - - $840
12,000
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$800
Cost:
$300
$140 2,000 $15 3 - - $645 - - - $140
2,000
kWh
$15
3
kW-months/year
-
-
lb
$645
-
$
-
-
$
09: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$720
Cost:
-
- - - - - - - - $720 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$720
-
$
10: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$253
Cost:
-
- - - - - - $253 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$253
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$25,853
Cost:
$35,295
$11,220 160,120 $11,165 2,038 $1,850 1,000 $898 - $720 - $11,220
160,120
kWh
$11,165
2,038
kW-months/year
$1,850
1,000
lb
$898
-
$
$720
-
$
TOTAL IMPLEMENTED Savings:
$23,493
Cost:
$34,825
$10,240 146,120 $11,150 2,035 $1,850 1,000 $253 - - - $10,240
146,120
kWh
$11,150
2,035
kW-months/year
$1,850
1,000
lb
$253
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Ancillary Material Cost