IAC Assessment: AM0417
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2002
Principal Product Corrugated Boxes
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 175,000
Annual Production 660,000 Thousand Feet
Production Hrs. Annual 6,096
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $291,780 4,713,427 kWh $0.06
Electricity Demand $82,952 13,230 kW-months/year $6.27
Natural Gas $201,584 33,596 MMBtu $6.00
TOTAL ENERGY COSTS $576,316
RECOMMENDED SAVINGS* $199,860 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $199,480
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$120,900
Cost:
$8,000
- - - - - - - - $120,900 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$120,900
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$32,450
Cost:
$24,980
- - $32,450 2,636 - - - - - - -
-
kWh
$32,450
2,636
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$32,210
Cost:
$4,900
- - - - $32,210 5,137 - - - - -
-
kWh
-
-
kW-months/year
$32,210
5,137
MMBtu
-
-
$
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,230
Cost:
$1,330
- - - - $7,230 1,170 - - - - -
-
kWh
-
-
kW-months/year
$7,230
1,170
MMBtu
-
-
$
-
-
$
05: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$3,480
Cost:
$450
- - - - $3,480 563 - - - - -
-
kWh
-
-
kW-months/year
$3,480
563
MMBtu
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,670
Cost:
$880
$1,670 38,830 - - - - - - - - $1,670
38,830
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,100
Cost:
$780
$315 7,320 $120 10 - - $665 - - - $315
7,320
kWh
$120
10
kW-months/year
-
-
MMBtu
$665
-
$
-
-
$
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$440
Cost:
-
$440 10,230 - - - - - - - - $440
10,230
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$380
Cost:
-
$330 7,630 $50 4 - - - - - - $330
7,630
kWh
$50
4
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$199,860
Cost:
$41,320
$2,755 64,010 $32,620 2,650 $42,920 6,870 $665 - $120,900 - $2,755
64,010
kWh
$32,620
2,650
kW-months/year
$42,920
6,870
MMBtu
$665
-
$
$120,900
-
$
TOTAL IMPLEMENTED Savings:
$199,480
Cost:
$41,320
$2,425 56,380 $32,570 2,646 $42,920 6,870 $665 - $120,900 - $2,425
56,380
kWh
$32,570
2,646
kW-months/year
$42,920
6,870
MMBtu
$665
-
$
$120,900
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost