IAC Assessment: AM0418
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0418
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2002
Principal Product Rubber gaskets, packing, sealing devices
NAICS n/a
SIC 3053 - Gaskets, Packing And Sealing Devices
Sales $10,000,000-$50,000,000
# of Employees 88
Plant Area (Sq.Ft.) 43,400
Annual Production 2,000,000 Pounds
Production Hrs. Annual 5,952
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $201,514 5,028,232 kWh $0.04
Electricity Demand $77,345 12,641 kW-months/year $6.12
Electricity Fees $5,529 - $ -
Natural Gas $297,512 44,140 MMBtu $6.74
TOTAL ENERGY COSTS $581,900
RECOMMENDED SAVINGS* $75,558 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $67,258
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $ $ $
01: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$33,700
Cost:
$4,735
- - $33,700 5,160 - - - - - - -
-
kWh
$33,700
5,160
MMBtu
-
-
$
-
-
$
-
-
$
02: 4.4450 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$20,000
Cost:
$6,000
- - - - $20,000 - - - - - -
-
kWh
-
-
MMBtu
$20,000
-
$
-
-
$
-
-
$
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$9,500
Cost:
$200
- - $9,500 1,460 - - - - - - -
-
kWh
$9,500
1,460
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.2514 COVER OPEN TANKS Savings:
$3,000
Cost:
-
- - - - - - - - $3,000 - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
$3,000
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,400
Cost:
$930
$300 6,000 - - $2,100 - - - - - $300
6,000
kWh
-
-
MMBtu
$2,100
-
$
-
-
$
-
-
$
06: 2.5122 REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS Savings:
$1,650
Cost:
$1,080
$1,650 33,000 - - - - - - - - $1,650
33,000
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,600
Cost:
$480
- - $1,600 240 - - - - - - -
-
kWh
$1,600
240
MMBtu
-
-
$
-
-
$
-
-
$
08: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,400
Cost:
$140
$1,400 28,600 - - - - - - - - $1,400
28,600
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
09: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,300
Cost:
$310
- - $1,300 200 - - - - - - -
-
kWh
$1,300
200
MMBtu
-
-
$
-
-
$
-
-
$
10: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$1,008
Cost:
-
- - - - - - $1,008 - - - -
-
kWh
-
-
MMBtu
-
-
$
$1,008
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$75,558
Cost:
$13,875
$3,350 67,600 $46,100 7,060 $22,100 - $1,008 - $3,000 - $3,350
67,600
kWh
$46,100
7,060
MMBtu
$22,100
-
$
$1,008
-
$
$3,000
-
$
TOTAL IMPLEMENTED Savings:
$67,258
Cost:
$12,155
$3,050 61,600 $43,200 6,620 $20,000 - $1,008 - - - $3,050
61,600
kWh
$43,200
6,620
MMBtu
$20,000
-
$
$1,008
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $ $ $
Electricity Usage Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost