IAC logo
IAC Assessment: AM0420
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0420
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2002
Principal Product Styrene-butadiene synthetic rubber
NAICS n/a
SIC 2822 - Synthetic Rubber
Sales $100,000,000-$500,000,000
# of Employees 500
Plant Area (Sq.Ft.) 2,835,000
Annual Production 500,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,372,461 86,332,000 kWh $0.04
Natural Gas $2,727,378 633,000 MMBtu $4.31
Other Energy $4,279,731 813,000 MMBtu $5.26
TOTAL ENERGY COSTS $10,379,570
RECOMMENDED SAVINGS* $836,200 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $66,000
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Gaseous Waste Personnel Changes Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Gaseous Waste Personnel Changes Administrative Changes
$ kWh $ MMBtu $ lb $ lb $ $ $ $
01: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$656,000
Cost:
$3,400,000
$(-571,000) (-28,100,000) $942,000 294,838 - - $285,000 35,016,300 - - - - $(-571,000)
(-28,100,000)
kWh
$942,000
294,838
MMBtu
-
-
lb
$285,000
35,016,300
lb
-
-
$
-
-
$
02: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$58,000
Cost:
$52,000
- - - - - - - - $58,000 - - - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
lb
$58,000
-
$
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$58,000
Cost:
-
$58,000 2,920,000 - - - - - - - - - - $58,000
2,920,000
kWh
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
04: 4.131 MODIFY PROCESS TO REDUCE MATERIAL USE/COST Savings:
$49,000
Cost:
-
- - - - $49,000 - - - - - - - -
-
kWh
-
-
MMBtu
$49,000
-
lb
-
-
lb
-
-
$
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,200
Cost:
-
$4,200 212,000 - - - - - - - - - - $4,200
212,000
kWh
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
06: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$3,300
Cost:
$900
$3,300 1,210,000 - - - - - - - - - - $3,300
1,210,000
kWh
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,000
Cost:
$1,800
$3,000 153,000 - - - - - - - - - - $3,000
153,000
kWh
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
08: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$2,500
Cost:
$150
- - $2,500 782 - - - - - - - - -
-
kWh
$2,500
782
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
09: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,500
Cost:
$2,300
$1,500 73,600 - - - - - - - - - - $1,500
73,600
kWh
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
-
-
$
10: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$700
Cost:
-
- - - - - - - - - - $700 - -
-
kWh
-
-
MMBtu
-
-
lb
-
-
lb
-
-
$
$700
-
$
TOTAL RECOMMENDED Savings:
$836,200
Cost:
$3,457,150
$(-501,000) (-23,531,400) $944,500 295,620 $49,000 - $285,000 35,016,300 $58,000 - $700 - $(-501,000)
(-23,531,400)
kWh
$944,500
295,620
MMBtu
$49,000
-
lb
$285,000
35,016,300
lb
$58,000
-
$
$700
-
$
TOTAL IMPLEMENTED Savings:
$66,000
Cost:
$3,350
$62,800 4,203,600 $2,500 782 - - - - - - $700 - $62,800
4,203,600
kWh
$2,500
782
MMBtu
-
-
lb
-
-
lb
-
-
$
$700
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ lb $ $ $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Gaseous Waste Personnel Changes Administrative Changes Electricity Usage Natural Gas Solid Waste (non-haz) Gaseous Waste Personnel Changes Administrative Changes