The Assessment Recommendation Codes ARC is a system for classifying recommendations.
[Manual]
TOP | ARC | Description | Recommendations Reccs | Recommended $ Savings | Average Payback (yrs) | Implementation Rate Imp Rate | |
---|---|---|---|---|---|---|---|
back | 3.xxxx | 3.xxxx WASTE MINIMIZATION / POLLUTION PREVENTION | 10,407 | $311,824,214 | 1.6 | 40.0% | |
back | 3.1xxx | 3.1xxx Operations | 1,276 | $78,248,886 | 1.0 | 40.4% | |
back | 3.11xx | 3.11xx Procedures | 1,171 | $75,811,439 | 1.0 | 39.9% | |
3.119x | 3.119x Miscellaneous | 675 | $47,677,267 | 1.0 | 44.4% | ||
3.1191 | 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | 498 | $33,936,414 | 1.1 | 41.2% | ||
3.1192 | 3.1192 REDUCE SCRAP PRODUCTION | 156 | $12,750,260 | 0.7 | 55.5% | ||
3.1193 | 3.1193 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING | 11 | $452,758 | 1.0 | 36.4% | ||
3.1194 | 3.1194 USE AUTOMATIC FLOW CONTROL | 9 | $532,394 | 0.9 | 42.9% |