IAC logo
IAC Assessment: AM0422
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0422
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2002
Principal Product Machinery noise control equipment
NAICS n/a
SIC 3569 - General Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 23,000
Annual Production 12,000 Tons
Production Hrs. Annual 1,990
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $46,548 560,256 kWh $0.08
Electricity Demand $6,975 2,370 kW-months/year $2.94
Electricity Fees $592 - $ -
TOTAL ENERGY COSTS $54,115
RECOMMENDED SAVINGS* $64,760 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,035
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $ $ $
01: 4.4460 AUTOMATE FINISHING PROCESS Savings:
$47,350
Cost:
$110,240
- - $1,250 205 $46,100 - - - - - -
-
kWh
$1,250
205
kW-months/year
$46,100
-
$
-
-
$
-
-
$
02: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$13,580
Cost:
$5,270
- - - - $1,520 - - - $12,060 - -
-
kWh
-
-
kW-months/year
$1,520
-
$
-
-
$
$12,060
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,545
Cost:
$30
$970 14,200 $575 94 - - - - - - $970
14,200
kWh
$575
94
kW-months/year
-
-
$
-
-
$
-
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$780
Cost:
$50
$590 8,600 $190 31 - - - - - - $590
8,600
kWh
$190
31
kW-months/year
-
-
$
-
-
$
-
-
$
05: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$645
Cost:
-
- - - - - - $645 - - - -
-
kWh
-
-
kW-months/year
-
-
$
$645
-
$
-
-
$
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$375
Cost:
$840
- - $375 61 - - - - - - -
-
kWh
$375
61
kW-months/year
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$345
Cost:
$310
$160 2,330 $20 3 $165 - - - - - $160
2,330
kWh
$20
3
kW-months/year
$165
-
$
-
-
$
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$140
Cost:
$50
$140 2,080 - - - - - - - - $140
2,080
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$64,760
Cost:
$116,790
$1,860 27,210 $2,410 394 $47,785 - $645 - $12,060 - $1,860
27,210
kWh
$2,410
394
kW-months/year
$47,785
-
$
$645
-
$
$12,060
-
$
TOTAL IMPLEMENTED Savings:
$17,035
Cost:
$5,710
$1,860 27,210 $785 128 $1,685 - $645 - $12,060 - $1,860
27,210
kWh
$785
128
kW-months/year
$1,685
-
$
$645
-
$
$12,060
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Administrative Changes Ancillary Material Cost