IAC Assessment: AM0427
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0427
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2003
Principal Product Electroplating
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $5,000,000-$10,000,000
# of Employees 68
Plant Area (Sq.Ft.) 17,900
Annual Production 365,000 Pieces
Production Hrs. Annual 4,630
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $64,536 918,774 kWh $0.07
Electricity Demand $8,822 3,507 kW-months/year $2.52
Electricity Fees $1,334 - $ -
Natural Gas $543 8 MMBtu $67.88
TOTAL ENERGY COSTS $75,235
RECOMMENDED SAVINGS* $15,220 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,220
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Primary Raw Material Electricity Usage Personnel Changes Primary Raw Material
$ kWh $ $ $ $
01: 4.132 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST Savings:
$11,250
Cost:
$500
- - - - $11,250 - -
-
kWh
-
-
$
$11,250
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,400
Cost:
$820
$260 5,400 $2,140 - - - $260
5,400
kWh
$2,140
-
$
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$570
Cost:
$60
$570 11,625 - - - - $570
11,625
kWh
-
-
$
-
-
$
04: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$400
Cost:
-
$400 8,150 - - - - $400
8,150
kWh
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$330
Cost:
$60
$330 6,730 - - - - $330
6,730
kWh
-
-
$
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$170
Cost:
$50
$170 3,500 - - - - $170
3,500
kWh
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$100
Cost:
$50
$100 2,300 - - - - $100
2,300
kWh
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$15,220
Cost:
$1,540
$1,830 37,705 $2,140 - $11,250 - $1,830
37,705
kWh
$2,140
-
$
$11,250
-
$
TOTAL IMPLEMENTED Savings:
$15,220
Cost:
$1,540
$1,830 37,705 $2,140 - $11,250 - $1,830
37,705
kWh
$2,140
-
$
$11,250
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Personnel Changes Primary Raw Material Electricity Usage Personnel Changes Primary Raw Material