IAC logo
IAC Assessment: AM0431
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0431
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2003
Principal Product Life science products
NAICS 325414 - Biological Product (except Diagnostic) Manufacturing
SIC 2836 - Biological Products Exc. Diagnostic
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 80,000
Annual Production 10,800 Pieces
Production Hrs. Annual 3,024
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,634 2,686,308 kWh $0.05
Electricity Demand $41,359 5,515 kW-months/year $7.50
TOTAL ENERGY COSTS $166,993
RECOMMENDED SAVINGS* $41,760 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $34,230
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ lb $ $ $ $
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$23,400
Cost:
$240
$23,400 545,000 - - - - - - - - $23,400
545,000
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,030
Cost:
$11,900
- - $5,030 671 - - - - - - -
-
kWh
$5,030
671
kW-months/year
-
-
lb
-
-
$
-
-
$
03: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$3,480
Cost:
$5,640
$2,080 48,360 - - - - $1,400 - - - $2,080
48,360
kWh
-
-
kW-months/year
-
-
lb
$1,400
-
$
-
-
$
04: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$2,100
Cost:
-
- - - - $2,100 - - - - - -
-
kWh
-
-
kW-months/year
$2,100
-
lb
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,460
Cost:
$1,790
$240 5,550 $150 19 - - $1,070 - - - $240
5,550
kWh
$150
19
kW-months/year
-
-
lb
$1,070
-
$
-
-
$
06: 2.7423 REDUCE HEAT GAIN BY WINDOW TINTING Savings:
$1,720
Cost:
$4,460
$1,720 40,000 - - - - - - - - $1,720
40,000
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
07: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$750
Cost:
-
- - - - - - - - $750 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$750
-
$
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,150
Cost:
-
$680 15,400 $470 62 - - - - - - $680
15,400
kWh
$470
62
kW-months/year
-
-
lb
-
-
$
-
-
$
09: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,130
Cost:
-
$1,130 26,440 - - - - - - - - $1,130
26,440
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
10: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$780
Cost:
$1,520
$460 10,700 $320 42 - - - - - - $460
10,700
kWh
$320
42
kW-months/year
-
-
lb
-
-
$
-
-
$
11: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$760
Cost:
-
$760 17,800 - - - - - - - - $760
17,800
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$41,760
Cost:
$25,550
$30,470 709,250 $5,970 794 $2,100 - $2,470 - $750 - $30,470
709,250
kWh
$5,970
794
kW-months/year
$2,100
-
lb
$2,470
-
$
$750
-
$
TOTAL IMPLEMENTED Savings:
$34,230
Cost:
$7,670
$28,290 658,550 $620 81 $2,100 - $2,470 - $750 - $28,290
658,550
kWh
$620
81
kW-months/year
$2,100
-
lb
$2,470
-
$
$750
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Personnel Changes Administrative Changes