IAC Assessment: AM0432
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0432
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2003
Principal Product Polyethylene wax, polypropylene, hot melt adhesives
NAICS 325520 - Adhesive Manufacturing
SIC 3084 - Plastics Pipe
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 80,500
Annual Production 50,000,000 Pounds
Production Hrs. Annual 6,000
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $164,614 2,015,899 kWh $0.08
Electricity Demand $25,702 8,744 kW-months/year $2.94
Electricity Fees $1,828 - $ -
Natural Gas $194,446 44,990 MMBtu $4.32
TOTAL ENERGY COSTS $386,590
RECOMMENDED SAVINGS* $53,913 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $50,263
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Administrative Changes Electricity Usage Natural Gas Personnel Changes Administrative Changes
$ kWh $ MMBtu $ $ $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$15,800
Cost:
$500
- - $15,800 3,654 - - - - -
-
kWh
$15,800
3,654
MMBtu
-
-
$
-
-
$
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$12,670
Cost:
$560
- - $12,670 2,934 - - - - -
-
kWh
$12,670
2,934
MMBtu
-
-
$
-
-
$
03: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$9,300
Cost:
$940
- - $9,300 2,151 - - - - -
-
kWh
$9,300
2,151
MMBtu
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,680
Cost:
$4,300
$4,680 59,000 - - $3,000 - - - $4,680
59,000
kWh
-
-
MMBtu
$3,000
-
$
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,380
Cost:
$500
$4,380 55,100 - - - - - - $4,380
55,100
kWh
-
-
MMBtu
-
-
$
-
-
$
06: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$3,000
Cost:
$7,400
$3,000 37,700 - - - - - - $3,000
37,700
kWh
-
-
MMBtu
-
-
$
-
-
$
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$315
Cost:
$190
- - $315 73 - - - - -
-
kWh
$315
73
MMBtu
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$335
Cost:
$765
$65 840 - - $270 - - - $65
840
kWh
-
-
MMBtu
$270
-
$
-
-
$
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$220
Cost:
$50
$220 2,800 - - - - - - $220
2,800
kWh
-
-
MMBtu
-
-
$
-
-
$
10: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$213
Cost:
-
- - - - - - $213 - -
-
kWh
-
-
MMBtu
-
-
$
$213
-
$
TOTAL RECOMMENDED Savings:
$53,913
Cost:
$15,205
$12,345 155,440 $38,085 8,812 $3,270 - $213 - $12,345
155,440
kWh
$38,085
8,812
MMBtu
$3,270
-
$
$213
-
$
TOTAL IMPLEMENTED Savings:
$50,263
Cost:
$6,850
$9,280 116,900 $37,770 8,739 $3,000 - $213 - $9,280
116,900
kWh
$37,770
8,739
MMBtu
$3,000
-
$
$213
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Personnel Changes Administrative Changes Electricity Usage Natural Gas Personnel Changes Administrative Changes