IAC logo
IAC Assessment: AM0433
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0433
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2003
Principal Product Polypropylene film
NAICS 326113 - Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $10,000,000-$50,000,000
# of Employees 170
Plant Area (Sq.Ft.) 200,000
Annual Production 30,000,000 Pounds
Production Hrs. Annual 8,568
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,046,752 41,488,245 kWh $0.03
Electricity Demand $139,420 22,236 kW-months/year $6.27
Natural Gas $249,867 59,338 MMBtu $4.21
TOTAL ENERGY COSTS $1,436,039
RECOMMENDED SAVINGS* $249,790 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $87,230
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Administrative Changes Electricity Usage Natural Gas Personnel Changes Administrative Changes
$ kWh $ MMBtu $ $ $ $
01: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$100,000
Cost:
-
- - - - - - $100,000 - -
-
kWh
-
-
MMBtu
-
-
$
$100,000
-
$
02: 2.1232 KEEP BOILER TUBES CLEAN Savings:
$83,000
Cost:
$1,500
- - $83,000 19,800 - - - - -
-
kWh
$83,000
19,800
MMBtu
-
-
$
-
-
$
03: 4.625 DEVELOP STANDARD OPERATING PROCEDURES Savings:
$61,000
Cost:
-
- - - - $61,000 - - - -
-
kWh
-
-
MMBtu
$61,000
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,100
Cost:
$200
$4,100 98,000 - - - - - - $4,100
98,000
kWh
-
-
MMBtu
-
-
$
-
-
$
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,385
Cost:
$720
$1,385 31,375 - - - - - - $1,385
31,375
kWh
-
-
MMBtu
-
-
$
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$175
Cost:
$420
$175 3,660 - - - - - - $175
3,660
kWh
-
-
MMBtu
-
-
$
-
-
$
07: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$130
Cost:
-
- - - - - - $130 - -
-
kWh
-
-
MMBtu
-
-
$
$130
-
$
TOTAL RECOMMENDED Savings:
$249,790
Cost:
$2,840
$5,660 133,035 $83,000 19,800 $61,000 - $100,130 - $5,660
133,035
kWh
$83,000
19,800
MMBtu
$61,000
-
$
$100,130
-
$
TOTAL IMPLEMENTED Savings:
$87,230
Cost:
$1,700
$4,100 98,000 $83,000 19,800 - - $130 - $4,100
98,000
kWh
$83,000
19,800
MMBtu
-
-
$
$130
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Personnel Changes Administrative Changes Electricity Usage Natural Gas Personnel Changes Administrative Changes