IAC logo
IAC Assessment: AM0435
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0435
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2003
Principal Product Pre-stressing strand and wire
NAICS 332618 - Other Fabricated Wire Product Manufacturing
SIC 3496 - Misc. Fabricated Wire Products
Sales $10,000,000-$50,000,000
# of Employees 44
Plant Area (Sq.Ft.) 130,000
Annual Production 62,000,000 Pounds
Production Hrs. Annual 6,072
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $908,781 13,410,138 kWh $0.07
Natural Gas $147,232 19,601 MMBtu $7.51
TOTAL ENERGY COSTS $1,056,013
RECOMMENDED SAVINGS* $40,535 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,175
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Administrative Changes Electricity Usage Personnel Changes Administrative Changes
$ kWh $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$20,300
Cost:
$500
$20,300 390,000 - - - - $20,300
390,000
kWh
-
-
$
-
-
$
02: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$12,740
Cost:
-
$12,740 212,430 - - - - $12,740
212,430
kWh
-
-
$
-
-
$
03: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$4,670
Cost:
-
- - - - $4,670 - -
-
kWh
-
-
$
$4,670
-
$
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,100
Cost:
-
$1,100 18,340 - - - - $1,100
18,340
kWh
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$950
Cost:
$235
$170 2,830 $780 - - - $170
2,830
kWh
$780
-
$
-
-
$
06: 2.7134 USE PHOTOCELL CONTROLS Savings:
$775
Cost:
$75
$775 12,920 - - - - $775
12,920
kWh
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$40,535
Cost:
$810
$35,085 636,520 $780 - $4,670 - $35,085
636,520
kWh
$780
-
$
$4,670
-
$
TOTAL IMPLEMENTED Savings:
$22,175
Cost:
$575
$22,175 421,260 - - - - $22,175
421,260
kWh
-
-
$
-
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Personnel Changes Administrative Changes Electricity Usage Personnel Changes Administrative Changes