IAC logo
IAC Assessment: AM0436
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0436
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2003
Principal Product Chain link fencing and products
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499 - Fabricated Metal Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 76
Plant Area (Sq.Ft.) 120,000
Annual Production 70,000,000 Pounds
Production Hrs. Annual 6,024
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $369,000 4,240,000 kWh $0.09
Natural Gas $160,000 34,992 MMBtu $4.57
TOTAL ENERGY COSTS $529,000
RECOMMENDED SAVINGS* $111,305 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $111,205
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Administrative Changes Electricity Usage Personnel Changes Administrative Changes
$ kWh $ $ $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$75,260
Cost:
-
- - - - $75,260 - -
-
kWh
-
-
$
$75,260
-
$
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$16,700
Cost:
-
- - - - $16,700 - -
-
kWh
-
-
$
$16,700
-
$
03: 2.7145 INSTALL SKYLIGHTS Savings:
$9,700
Cost:
$33,250
$9,700 123,300 - - - - $9,700
123,300
kWh
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,930
Cost:
$800
$4,930 62,900 - - - - $4,930
62,900
kWh
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,435
Cost:
$20
$1,435 18,300 - - - - $1,435
18,300
kWh
-
-
$
-
-
$
06: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$950
Cost:
-
$950 12,100 - - - - $950
12,100
kWh
-
-
$
-
-
$
07: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$1,250
Cost:
-
$1,400 17,900 $(-150) - - - $1,400
17,900
kWh
$(-150)
-
$
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$280
Cost:
$75
$280 3,590 - - - - $280
3,590
kWh
-
-
$
-
-
$
09: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$700
Cost:
$40
$700 8,870 - - - - $700
8,870
kWh
-
-
$
-
-
$
10: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$100
Cost:
-
$100 1,320 - - - - $100
1,320
kWh
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$111,305
Cost:
$34,185
$19,495 248,280 $(-150) - $91,960 - $19,495
248,280
kWh
$(-150)
-
$
$91,960
-
$
TOTAL IMPLEMENTED Savings:
$111,205
Cost:
$34,185
$19,395 246,960 $(-150) - $91,960 - $19,395
246,960
kWh
$(-150)
-
$
$91,960
-
$
Savings
Cost
$ kWh $ $ $ $
Electricity Usage Personnel Changes Administrative Changes Electricity Usage Personnel Changes Administrative Changes