IAC Assessment: AM0440
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0440
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2003
Principal Product Industrial valve actuators
NAICS 333995 - Fluid Power Cylinder and Actuator Manufacturing
SIC 3593 - Fluid Power Cylinders & Actuators
Sales $10,000,000-$50,000,000
# of Employees 180
Plant Area (Sq.Ft.) 146,000
Annual Production 16,545 Pieces
Production Hrs. Annual 5,980
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $259,431 5,781,214 kWh $0.04
Electricity Demand $42,999 7,026 kW-months/year $6.12
Electricity Fees $40,380 - $ -
Natural Gas $39,891 4,650 MMBtu $8.58
TOTAL ENERGY COSTS $382,701
RECOMMENDED SAVINGS* $23,773 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,763
#|Description Savings
Cost
Status Electricity Usage Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ $ $ $ $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,150
Cost:
$500
$5,150 126,900 - - - - - - $5,150
126,900
kWh
-
-
$
-
-
$
-
-
$
02: 3.7132 REUSE RAGS UNTIL COMPLETELY SOILED Savings:
$4,500
Cost:
-
- - - - $4,500 - - - -
-
kWh
-
-
$
$4,500
-
$
-
-
$
03: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$4,010
Cost:
$340
- - - - $4,010 - - - -
-
kWh
-
-
$
$4,010
-
$
-
-
$
04: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$7,553
Cost:
$800
- - $1,553 - - - $6,000 - -
-
kWh
$1,553
-
$
-
-
$
$6,000
-
$
05: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$1,490
Cost:
$2,880
- - $1,490 - - - - - -
-
kWh
$1,490
-
$
-
-
$
-
-
$
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$830
Cost:
$42
$830 20,400 - - - - - - $830
20,400
kWh
-
-
$
-
-
$
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$240
Cost:
$145
$95 2,330 $145 - - - - - $95
2,330
kWh
$145
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$23,773
Cost:
$4,707
$6,075 149,630 $3,188 - $8,510 - $6,000 - $6,075
149,630
kWh
$3,188
-
$
$8,510
-
$
$6,000
-
$
TOTAL IMPLEMENTED Savings:
$19,763
Cost:
$4,367
$6,075 149,630 $3,188 - $4,500 - $6,000 - $6,075
149,630
kWh
$3,188
-
$
$4,500
-
$
$6,000
-
$
Savings
Cost
$ kWh $ $ $ $ $ $
Electricity Usage Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost