IAC Assessment: AM0445
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0445
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2003
Principal Product Food processing and battery handling equipment
NAICS 333241 - Food Product Machinery Manufacturing
SIC 3556 - Food Products Machinery
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 92,000
Annual Production 1,200,000 Pounds
Production Hrs. Annual 2,328
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,508 1,209,162 kWh $0.05
Electricity Demand $10,505 5,412 kW-months/year $1.94
Electricity Fees $17,551 - $ -
Natural Gas $51,184 9,080 MMBtu $5.64
TOTAL ENERGY COSTS $135,748
RECOMMENDED SAVINGS* $12,490 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,710
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$5,800
Cost:
-
$5,800 123,300 - - - - - - $5,800
123,300
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$2,390
Cost:
-
$2,390 50,800 - - - - - - $2,390
50,800
kWh
-
-
kW-months/year
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,390
Cost:
$500
$1,390 29,600 - - - - - - $1,390
29,600
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$430
Cost:
-
$430 9,230 - - - - - - $430
9,230
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$380
Cost:
$15
$260 5,600 $120 29 - - - - $260
5,600
kWh
$120
29
kW-months/year
-
-
$
-
-
$
06: 3.7132 REUSE RAGS UNTIL COMPLETELY SOILED Savings:
$1,400
Cost:
-
- - - - - - $1,400 - -
-
kWh
-
-
kW-months/year
-
-
$
$1,400
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$700
Cost:
$380
$120 2,630 $10 3 $570 - - - $120
2,630
kWh
$10
3
kW-months/year
$570
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$12,490
Cost:
$895
$10,390 221,160 $130 32 $570 - $1,400 - $10,390
221,160
kWh
$130
32
kW-months/year
$570
-
$
$1,400
-
$
TOTAL IMPLEMENTED Savings:
$10,710
Cost:
$880
$10,130 215,560 $10 3 $570 - - - $10,130
215,560
kWh
$10
3
kW-months/year
$570
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost