IAC logo
IAC Assessment: AM0454
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AM0454
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2004
Principal Product Titanium and stainless steel extrusions
NAICS 331410 - Nonferrous Metal (except Aluminum) Smelting and Refining
SIC 3356 - Nonferrous Rolling And Drawing, Nec
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 133,000
Annual Production 1,400 Pieces
Production Hrs. Annual 3,560
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $173,888 2,493,724 kWh $0.07
Electricity Demand $90,187 29,505 kW-months/year $3.06
Electricity Fees $65,561 - $ -
Natural Gas $82,272 9,889 MMBtu $8.32
TOTAL ENERGY COSTS $411,908
RECOMMENDED SAVINGS* $9,180 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$4,550
Cost:
-
$4,550 64,900 - - - - $4,550
64,900
kWh
-
-
kW-months/year
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,440
Cost:
$200
$1,440 20,500 - - - - $1,440
20,500
kWh
-
-
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$640
Cost:
$840
$390 5,600 $250 70 - - $390
5,600
kWh
$250
70
kW-months/year
-
-
$
04: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$630
Cost:
$400
$630 9,000 - - - - $630
9,000
kWh
-
-
kW-months/year
-
-
$
05: 4.454 MODIFY STARTUP/SHUTDOWN TIMES Savings:
$1,920
Cost:
-
- - - - $1,920 - -
-
kWh
-
-
kW-months/year
$1,920
-
$
TOTAL RECOMMENDED Savings:
$9,180
Cost:
$1,440
$7,010 100,000 $250 70 $1,920 - $7,010
100,000
kWh
$250
70
kW-months/year
$1,920
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes