Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2004
Principal Product Anatomical models and patient simulators
NAICS 332710 - Machine Shops
SIC 3841 - Surgical And Medical Instruments
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 109,400
Annual Production 43,000 Pieces
Production Hrs. Annual 2,354
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $106,819 1,477,945 kWh $0.07
Electricity Demand $19,755 5,204 kW-months/year $3.80
Electricity Fees $8,886 - $ -
Natural Gas $67,107 9,927 MMBtu $6.76
TOTAL ENERGY COSTS $202,567
RECOMMENDED SAVINGS* $52,904 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,679
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ lb $ $ $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$13,275
Cost:
$2,300
$13,275 224,495 - - - - - - - - - - $13,275
224,495
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$3,780
Cost:
$2,320
$3,780 67,540 - - - - - - - - - - $3,780
67,540
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,210
Cost:
$400
$1,220 21,760 $990 117 - - - - - - - - $1,220
21,760
kWh
$990
117
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$515
Cost:
$1,270
$515 7,200 - - - - - - - - - - $515
7,200
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
05: 2.7145 INSTALL SKYLIGHTS Savings:
$360
Cost:
-
$540 7,700 - - - - - - $(-180) - - - $540
7,700
kWh
-
-
kW-months/year
-
-
$
-
-
lb
$(-180)
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$350
Cost:
$290
$350 5,340 - - - - - - - - - - $350
5,340
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
-
-
$
07: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$13,980
Cost:
$5,590
- - - - $2,800 - - - - - $11,180 - -
-
kWh
-
-
kW-months/year
$2,800
-
$
-
-
lb
-
-
$
$11,180
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$18,434
Cost:
$5,500
- - - - - - $18,434 - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$18,434
-
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$52,904
Cost:
$17,670
$19,680 334,035 $990 117 $2,800 - $18,434 - $(-180) - $11,180 - $19,680
334,035
kWh
$990
117
kW-months/year
$2,800
-
$
$18,434
-
lb
$(-180)
-
$
$11,180
-
$
TOTAL IMPLEMENTED Savings:
$51,679
Cost:
$16,110
$18,275 313,795 $990 117 $2,800 - $18,434 - - - $11,180 - $18,275
313,795
kWh
$990
117
kW-months/year
$2,800
-
$
$18,434
-
lb
-
-
$
$11,180
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Personnel Changes One-time Revenue or Avoided Cost