Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 2005 |
Principal Product | Carbonated beverages |
NAICS | 311930 - Flavoring Syrup and Concentrate Manufacturing |
SIC | 2086 - Bottled And Canned Soft Drinks |
Sales | $10,000,000-$50,000,000 |
# of Employees | 105 |
Plant Area (Sq.Ft.) | 120,000 |
Annual Production | 7,200,000 Pieces |
Production Hrs. Annual | 4,344 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $166,393 | 2,730,376 | kWh | $0.06 |
Electricity Demand | $45,477 | 11,736 | kW-months/year | $3.88 |
Electricity Fees | $897 | - | $ | - |
Natural Gas | $46,470 | 6,334 | MMBtu | $7.34 |
TOTAL ENERGY COSTS | $259,237 | |||
RECOMMENDED SAVINGS* | $59,695 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $59,415 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4113 TREAT AND REUSE RINSE WATERS |
Savings: $50,000 Cost: $2,000 |
- | - | - | - | - | - | $50,000 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$50,000 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,940 Cost: $500 |
$4,800 | 81,000 | $1,140 | 224 | - | - | - | - | - | - |
$4,800 81,000 kWh |
$1,140 224 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $1,210 Cost: - |
$1,210 | 20,570 | - | - | - | - | - | - | - | - |
$1,210 20,570 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $1,020 Cost: - |
$800 | 13,550 | $220 | 37 | - | - | - | - | - | - |
$800 13,550 kWh |
$220 37 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $640 Cost: - |
$490 | 8,240 | $150 | 29 | - | - | - | - | - | - |
$490 8,240 kWh |
$150 29 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $280 Cost: $50 |
- | - | - | - | $280 | 31 | - | - | - | - |
- - kWh |
- - kW-months/year |
$280 31 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $605 Cost: $350 |
$130 | 2,210 | $15 | 3 | - | - | - | - | $460 | - |
$130 2,210 kWh |
$15 3 kW-months/year |
- - MMBtu |
- - lb |
$460 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $59,695 Cost: $2,900 |
$7,430 | 125,570 | $1,525 | 293 | $280 | 31 | $50,000 | - | $460 | - | $7,430 125,570 kWh |
$1,525 293 kW-months/year |
$280 31 MMBtu |
$50,000 - lb |
$460 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $59,415 Cost: $2,850 |
$7,430 | 125,570 | $1,525 | 293 | - | - | $50,000 | - | $460 | - | $7,430 125,570 kWh |
$1,525 293 kW-months/year |
- - MMBtu |
$50,000 - lb |
$460 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (haz) | Personnel Changes |