Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 2005 |
Principal Product | Wooden cabinets |
NAICS | 337110 - Wood Kitchen Cabinet and Countertop Manufacturing |
SIC | 2431 - Millwork |
Sales | $10,000,000-$50,000,000 |
# of Employees | 74 |
Plant Area (Sq.Ft.) | 314,000 |
Annual Production | 42,000 Pieces |
Production Hrs. Annual | 4,489 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $51,889 | 669,528 | kWh | $0.08 |
Electricity Fees | $4,539 | - | $ | - |
TOTAL ENERGY COSTS | $56,428 | |||
RECOMMENDED SAVINGS* | $32,375 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $28,500 |
#|Description |
Savings Cost |
Status | Electricity Usage | Ancillary Material Cost | Electricity Usage | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $9,500 Cost: $500 |
$9,500 | 122,000 | - | - |
$9,500 122,000 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $9,500 Cost: $20,000 |
- | - | $9,500 | - |
- - kWh |
$9,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS |
Savings: $4,800 Cost: - |
- | - | $4,800 | - |
- - kWh |
$4,800 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.6125 SELL COMBUSTIBLE WASTE |
Savings: $3,600 Cost: $500 |
- | - | $3,600 | - |
- - kWh |
$3,600 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $2,800 Cost: $1,230 |
$2,800 | 35,700 | - | - |
$2,800 35,700 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7145 INSTALL SKYLIGHTS |
Savings: $1,300 Cost: $3,670 |
$1,300 | 16,900 | - | - |
$1,300 16,900 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $600 Cost: $100 |
$600 | 7,600 | - | - |
$600 7,600 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $275 Cost: $14 |
$275 | 3,560 | - | - |
$275 3,560 kWh |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $32,375 Cost: $26,014 |
$14,475 | 185,760 | $17,900 | - | $14,475 185,760 kWh |
$17,900 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $28,500 Cost: $25,500 |
$14,200 | 182,200 | $14,300 | - | $14,200 182,200 kWh |
$14,300 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Ancillary Material Cost | Electricity Usage | Ancillary Material Cost |