IAC Assessment: AM0494
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Texas A&M, College Station
Assessment Year 2005
Principal Product Plastic & rubber fabrication
NAICS 325212 - Synthetic Rubber Manufacturing
SIC 3064 -
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 36,000
Annual Production 125,000 Pounds
Production Hrs. Annual 2,500
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,740 1,496,592 kWh $0.06
Electricity Demand $43,944 9,228 kW-months/year $4.76
Electricity Fees $3,216 - $ -
Natural Gas $84,951 9,183 MMBtu $9.25
TOTAL ENERGY COSTS $223,851
RECOMMENDED SAVINGS* $40,880 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $37,500
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz)
$ kWh $ kW-months/year $ MMBtu $ lb $ lb
01: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$14,700
Cost:
$5,000
- - - - $14,700 1,586 - - - - -
-
kWh
-
-
kW-months/year
$14,700
1,586
MMBtu
-
-
lb
-
-
lb
02: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$5,880
Cost:
$540
$1,290 21,100 $1,580 449 - - $3,010 100,000,000 - - $1,290
21,100
kWh
$1,580
449
kW-months/year
-
-
MMBtu
$3,010
100,000,000
lb
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,400
Cost:
$500
$4,130 67,400 $1,270 359 - - - - - - $4,130
67,400
kWh
$1,270
359
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
04: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$4,450
Cost:
$800
- - - - $4,450 484 - - - - -
-
kWh
-
-
kW-months/year
$4,450
484
MMBtu
-
-
lb
-
-
lb
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,870
Cost:
$9,160
- - $3,870 1,096 - - - - - - -
-
kWh
$3,870
1,096
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,440
Cost:
$760
$1,100 18,000 $340 96 - - - - - - $1,100
18,000
kWh
$340
96
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,370
Cost:
$795
- - - - $1,370 148 - - - - -
-
kWh
-
-
kW-months/year
$1,370
148
MMBtu
-
-
lb
-
-
lb
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,330
Cost:
$12
$1,020 16,700 $310 89 - - - - - - $1,020
16,700
kWh
$310
89
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
09: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$870
Cost:
-
$740 12,000 $130 37 - - - - - - $740
12,000
kWh
$130
37
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
10: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$770
Cost:
$660
- - - - - - $770 120 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$770
120
lb
-
-
lb
11: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$570
Cost:
-
$400 6,499 $170 47 - - - - - - $400
6,499
kWh
$170
47
kW-months/year
-
-
MMBtu
-
-
lb
-
-
lb
12: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$230
Cost:
$200
- - - - - - - - $230 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$230
-
lb
TOTAL RECOMMENDED Savings:
$40,880
Cost:
$18,427
$8,680 141,699 $7,670 2,173 $20,520 2,218 $3,780 100,000,120 $230 - $8,680
141,699
kWh
$7,670
2,173
kW-months/year
$20,520
2,218
MMBtu
$3,780
100,000,120
lb
$230
-
lb
TOTAL IMPLEMENTED Savings:
$37,500
Cost:
$16,872
$7,180 117,200 $7,160 2,030 $19,150 2,070 $3,780 100,000,120 $230 - $7,180
117,200
kWh
$7,160
2,030
kW-months/year
$19,150
2,070
MMBtu
$3,780
100,000,120
lb
$230
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Solid Waste (haz)