Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Texas A&M, College Station |
---|---|
Assessment Year | 2006 |
Principal Product | Plug valves, pipeline closures |
NAICS | 332919 - Other Metal Valve and Pipe Fitting Manufacturing |
SIC | 3494 - Valves And Pipe Fittings, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 71,900 |
Annual Production | 38,000 Pieces |
Production Hrs. Annual | 5,781 |
Location (State) | TX |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $106,607 | 1,807,104 | kWh | $0.06 |
Electricity Fees | $20,708 | - | $ | - |
TOTAL ENERGY COSTS | $127,315 | |||
RECOMMENDED SAVINGS* | $11,980 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $4,180 |
#|Description |
Savings Cost |
Status | Electricity Usage | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,340 Cost: $1,125 |
$2,900 | 49,100 | - | - | - | - | $(-1,560) | - |
$2,900 49,100 kWh |
- - $ |
- - $ |
$(-1,560) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE |
Savings: $2,560 Cost: $1,640 |
- | - | $2,490 | - | - | - | $70 | - |
- - kWh |
$2,490 - $ |
- - $ |
$70 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES |
Savings: $2,270 Cost: - |
- | - | - | - | $2,270 | - | - | - |
- - kWh |
- - $ |
$2,270 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,910 Cost: $1,000 |
$1,910 | 32,000 | - | - | - | - | - | - |
$1,910 32,000 kWh |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7145 INSTALL SKYLIGHTS |
Savings: $1,170 Cost: $2,140 |
$1,550 | 26,000 | $(-380) | - | - | - | - | - |
$1,550 26,000 kWh |
$(-380) - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $1,360 Cost: $470 |
$1,360 | 22,750 | - | - | - | - | - | - |
$1,360 22,750 kWh |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $1,000 Cost: - |
$1,000 | 17,250 | - | - | - | - | - | - |
$1,000 17,250 kWh |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $370 Cost: - |
$370 | 6,200 | - | - | - | - | - | - |
$370 6,200 kWh |
- - $ |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $11,980 Cost: $6,375 |
$9,090 | 153,300 | $2,110 | - | $2,270 | - | $(-1,490) | - | $9,090 153,300 kWh |
$2,110 - $ |
$2,270 - $ |
$(-1,490) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $4,180 Cost: $1,000 |
$1,910 | 32,000 | - | - | $2,270 | - | - | - | $1,910 32,000 kWh |
- - $ |
$2,270 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Personnel Changes | Administrative Changes | Ancillary Material Cost |